A platform for research: civil engineering, architecture and urbanism
COUNTER-WEIGHT BLOCK CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a construction method for imparting a counter-weight to a steel pipe pile in which one end side is joined to another end side of a transverse beam which receives a weight of a structure and hit in a ground through a mouth pipe while shortening time.SOLUTION: A counter-weight block construction method for imparting a counter-weight to a steel pipe pile in which one end side is joined to another end side of a transverse beam which receives a weight of a structure and hit in a ground through a mouth pipe includes: fixing a falling lid to the steel pipe pile position in the mouth pipe; disposing a plurality of concrete blocks along an inner peripheral surface of the mouth pipe; and injecting and solidifying ballast crushed stone and cement milk inside the mouth pipe surrounded by the disposed concrete blocks.SELECTED DRAWING: Figure 5
【課題】時間を短縮して、一端側が構造物の重量を受ける横桁の他端側に結合され、口元管を通して土中に打設される鋼管杭にカウンターウエイトを付与する工法を提供する。【解決手段】一端側が構造物の重量を受ける横桁の他端側に結合され、口元管を通して土中に打設される鋼管杭にカウンターウエイトを付与するカウンターウエイトブロック工法であって、前記口元管内に位置する鋼管杭に落し蓋を固定し、前記口元管の内周面に沿ってコンクリートブロックを複数配置し、前記配置されたコンクリートブロックで囲まれる前記口元管の内部にバラスト砕石及びセメントミルクを注入固化する。【選択図】図5
COUNTER-WEIGHT BLOCK CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a construction method for imparting a counter-weight to a steel pipe pile in which one end side is joined to another end side of a transverse beam which receives a weight of a structure and hit in a ground through a mouth pipe while shortening time.SOLUTION: A counter-weight block construction method for imparting a counter-weight to a steel pipe pile in which one end side is joined to another end side of a transverse beam which receives a weight of a structure and hit in a ground through a mouth pipe includes: fixing a falling lid to the steel pipe pile position in the mouth pipe; disposing a plurality of concrete blocks along an inner peripheral surface of the mouth pipe; and injecting and solidifying ballast crushed stone and cement milk inside the mouth pipe surrounded by the disposed concrete blocks.SELECTED DRAWING: Figure 5
【課題】時間を短縮して、一端側が構造物の重量を受ける横桁の他端側に結合され、口元管を通して土中に打設される鋼管杭にカウンターウエイトを付与する工法を提供する。【解決手段】一端側が構造物の重量を受ける横桁の他端側に結合され、口元管を通して土中に打設される鋼管杭にカウンターウエイトを付与するカウンターウエイトブロック工法であって、前記口元管内に位置する鋼管杭に落し蓋を固定し、前記口元管の内周面に沿ってコンクリートブロックを複数配置し、前記配置されたコンクリートブロックで囲まれる前記口元管の内部にバラスト砕石及びセメントミルクを注入固化する。【選択図】図5
COUNTER-WEIGHT BLOCK CONSTRUCTION METHOD
カウンターウエイトブロック工法
SASAGAWA TORU (author) / UTSUGI HIROYUKI (author) / OKUNI NOBUHIKO (author) / KOBASHI HIROKI (author) / KOSAKAI NORIYUKI (author) / KAWASE AYA (author)
2018-11-15
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
B61B
RAILWAY SYSTEMS
,
Eisenbahnanlagen
/
E02D
FOUNDATIONS
,
Gründungen
Balance block for counter weight of engineering machinery
European Patent Office | 2023
|