A platform for research: civil engineering, architecture and urbanism
RETAINING WALL CONSTRUCTION METHOD AND CUTTING PANEL AND CONNECTION PANEL
PROBLEM TO BE SOLVED: To provide a retaining wall construction method to construct a retaining wall by cutting away a part of banking and ground so that the banking and ground are stabilized by narrowing a clearance between the banking or the ground and the retaining wall and a cutting panel and a connection panel used for the same.SOLUTION: A retaining wall construction method comprises: a brace erection process to erect a brace 1 with substantially H-shaped cross section, which is formed of a first flange part 11, a second flange part 12, and a web part 13 located between the two flange parts, at a position at which a range of region to construct the retaining wall is separated at appropriate interval while disposing the first flange part on the banking side or the ground side; a cutting panel installation process to dispose the cutting panel 3, which can slide along a rail that is respective first flange part of adjacent braces, between the braces 1; a cutting panel force fit process to forcibly push down the cutting panel 3; and a wall panel construction process to construct a wall panel by disposing a panel body on a front side of the second flange part and pinching members 22, 23 on a rear side of the flange part and connecting the pinching members to pinch the flange.SELECTED DRAWING: Figure 1
【課題】盛土や地山の一部を削り取って擁壁を構築する場合に、擁壁との間の隙間を小さくして盛土及び地山を安定させた状態で擁壁を構築する方法と、当該構築方法に使用する切削パネル及び連結パネルを提供する。【解決手段】第1及び第2の二つのフランジ部11,12とその中間のウエブ部13とで形成される断面略H形状の支柱1を、擁壁を構築すべき範囲を適宜間隔に区切った位置で第1のフランジ部を盛土または地山の側に配置しつつ立設する支柱立設工程と、隣接する支柱の各第1のフランジ部をレールとして、レールに沿って摺動可能な切削パネル3を、各支柱1の間にそれぞれ配置する切削パネル設置工程と、切削パネル3を強制的に下降させる切削パネル圧入工程と、第2のフランジ部の正面側にパネル本体を、フランジ部の背面側に挟持部材22、23を配置し、両者を連結することによりフランジを挟持しつつ壁パネルを構築する壁パネル構築工程を含む。【選択図】図1
RETAINING WALL CONSTRUCTION METHOD AND CUTTING PANEL AND CONNECTION PANEL
PROBLEM TO BE SOLVED: To provide a retaining wall construction method to construct a retaining wall by cutting away a part of banking and ground so that the banking and ground are stabilized by narrowing a clearance between the banking or the ground and the retaining wall and a cutting panel and a connection panel used for the same.SOLUTION: A retaining wall construction method comprises: a brace erection process to erect a brace 1 with substantially H-shaped cross section, which is formed of a first flange part 11, a second flange part 12, and a web part 13 located between the two flange parts, at a position at which a range of region to construct the retaining wall is separated at appropriate interval while disposing the first flange part on the banking side or the ground side; a cutting panel installation process to dispose the cutting panel 3, which can slide along a rail that is respective first flange part of adjacent braces, between the braces 1; a cutting panel force fit process to forcibly push down the cutting panel 3; and a wall panel construction process to construct a wall panel by disposing a panel body on a front side of the second flange part and pinching members 22, 23 on a rear side of the flange part and connecting the pinching members to pinch the flange.SELECTED DRAWING: Figure 1
【課題】盛土や地山の一部を削り取って擁壁を構築する場合に、擁壁との間の隙間を小さくして盛土及び地山を安定させた状態で擁壁を構築する方法と、当該構築方法に使用する切削パネル及び連結パネルを提供する。【解決手段】第1及び第2の二つのフランジ部11,12とその中間のウエブ部13とで形成される断面略H形状の支柱1を、擁壁を構築すべき範囲を適宜間隔に区切った位置で第1のフランジ部を盛土または地山の側に配置しつつ立設する支柱立設工程と、隣接する支柱の各第1のフランジ部をレールとして、レールに沿って摺動可能な切削パネル3を、各支柱1の間にそれぞれ配置する切削パネル設置工程と、切削パネル3を強制的に下降させる切削パネル圧入工程と、第2のフランジ部の正面側にパネル本体を、フランジ部の背面側に挟持部材22、23を配置し、両者を連結することによりフランジを挟持しつつ壁パネルを構築する壁パネル構築工程を含む。【選択図】図1
RETAINING WALL CONSTRUCTION METHOD AND CUTTING PANEL AND CONNECTION PANEL
擁壁構築方法ならびに切削パネルおよび連結パネル
MIURA KINYA (author) / KURITA KAZUHIRO (author) / KONAMI TAKEJI (author)
2018-11-15
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Panel type retaining wall construction method using color panel and retaining wall
European Patent Office | 2024
|Concrete panel for Cutting retaining wall that is Cutting retaining wall by the Concrete panel
European Patent Office | 2020
Concrete panel for Cutting retaining wall that is Cutting retaining wall by the Concrete panel
European Patent Office | 2019
|Panel type retaining wall construction method using coupler and panel type retaining wall
European Patent Office | 2024
|