CONVEYANCE SYSTEM FOR CONCRETE, AND METHOD FOR CONVEYING CONCRETE
PROBLEM TO BE SOLVED: To provide a conveyance system that can convey concrete to a position below a top end even when a batcher plant is provided at a height of the top end of a dam.SOLUTION: The conveyance system comprises a plurality of conveyors 4 extending horizontally and a plurality of conveyance chutes 2 extending vertically. On a slope, the plurality of conveyors 4 and the plurality of conveyance chutes 2 are disposed alternately. Concrete conveyed by the conveyor 4 is dropped to a conveyance chute 2 that is located downstream of the conveyor 4, and concrete dropped to the conveyance chute 2 is dropped to the conveyor 4 that is located downstream of the conveyance chute 2. Inside the conveyance chute 2, protrusions making the opening area small compared to other parts are formed.SELECTED DRAWING: Figure 2
【課題】ダムの天端の高さにバッチャープラントを設けた場合であっても、天端よりも下方の位置にコンクリートを搬送することができる搬送システムを提供する。【解決手段】搬送システムは、水平方向に延びる複数のコンベア4と、垂直方向に延びる複数の搬送シュート2と、を備え、斜面では、複数のコンベア4と、複数の搬送シュート2とが交互に配置され、コンベア4により運ばれたコンクリートは、このコンベア4の下流に位置する搬送シュート2に投下され、搬送シュート2に投下されたコンクリートは、搬送シュート2の下流に位置するコンベア4に投下され、搬送シュート2の管内には、他の部位に比べて開口面積が小さくなるような突部が形成されている。【選択図】図2
CONVEYANCE SYSTEM FOR CONCRETE, AND METHOD FOR CONVEYING CONCRETE
PROBLEM TO BE SOLVED: To provide a conveyance system that can convey concrete to a position below a top end even when a batcher plant is provided at a height of the top end of a dam.SOLUTION: The conveyance system comprises a plurality of conveyors 4 extending horizontally and a plurality of conveyance chutes 2 extending vertically. On a slope, the plurality of conveyors 4 and the plurality of conveyance chutes 2 are disposed alternately. Concrete conveyed by the conveyor 4 is dropped to a conveyance chute 2 that is located downstream of the conveyor 4, and concrete dropped to the conveyance chute 2 is dropped to the conveyor 4 that is located downstream of the conveyance chute 2. Inside the conveyance chute 2, protrusions making the opening area small compared to other parts are formed.SELECTED DRAWING: Figure 2
【課題】ダムの天端の高さにバッチャープラントを設けた場合であっても、天端よりも下方の位置にコンクリートを搬送することができる搬送システムを提供する。【解決手段】搬送システムは、水平方向に延びる複数のコンベア4と、垂直方向に延びる複数の搬送シュート2と、を備え、斜面では、複数のコンベア4と、複数の搬送シュート2とが交互に配置され、コンベア4により運ばれたコンクリートは、このコンベア4の下流に位置する搬送シュート2に投下され、搬送シュート2に投下されたコンクリートは、搬送シュート2の下流に位置するコンベア4に投下され、搬送シュート2の管内には、他の部位に比べて開口面積が小さくなるような突部が形成されている。【選択図】図2
CONVEYANCE SYSTEM FOR CONCRETE, AND METHOD FOR CONVEYING CONCRETE
コンクリートの搬送システム、及び、コンクリートの搬送方法
KABUKI KOKICHI (author) / TAKEDA MITSUO (author)
2018-11-15
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
CONCRETE CONVEYANCE EQUIPMENT AND CONCRETE CONVEYANCE METHOD
European Patent Office | 2023
|Concrete conveying system and concrete conveying construction method
European Patent Office | 2023
|CONCRETE CONVEYANCE EQUIPMENT AND LENGTH ADJUSTMENT METHOD FOR CONCRETE CONVEYANCE EQUIPMENT
European Patent Office | 2023
|