FLOOR CONSTRUCTION METHOD AND SPACER PART
To provide a floor construction method and a spacer part capable of preventing an elastic member from being compressed to a value exceeding a permissible value.SOLUTION: A floor construction method 40 is provided with processes from a first process 41 to an eighth process 48. The first process 41 is a process to fix a beam 11. The second process 42 is a process to bond an elastic member 12 to the beam 11. The third process 43 is a process to place a spacer part 20 on the beam 11. The fourth process 44 is a process to install a floor panel 13. The fifth process 45 is a process to place material 15 on a floor panel 13A. The sixth process 46 is a process to bond fireproof material 17 to the beam 11. The seventh process 47 is a process to use the material 15. The eighth process 48 is a process to pull out the spacer part 20 placed between the beam 11 and the floor panel 13.SELECTED DRAWING: Figure 8
【課題】弾性部材が許容値を超えて圧縮されることを抑制する。【解決手段】床施工方法40は、第1工程41〜第8工程48を備える。第1工程41は、梁11を固定する工程である。第2工程42は、梁11に弾性部材12を貼着する工程である。第3工程43は、梁11にスペーサー金具20を載置する工程である。第4工程44は、床パネル13を設置する工程である。第5工程45は、資材15を床パネル13Aに載置する工程である。第6工程46は、梁11に防火材17を貼着する工程である。第7工程47は、資材15を使用する工程である。第8工程48は、梁11と床パネル13との間からスペーサー金具20を引き抜く工程である。【選択図】図8
FLOOR CONSTRUCTION METHOD AND SPACER PART
To provide a floor construction method and a spacer part capable of preventing an elastic member from being compressed to a value exceeding a permissible value.SOLUTION: A floor construction method 40 is provided with processes from a first process 41 to an eighth process 48. The first process 41 is a process to fix a beam 11. The second process 42 is a process to bond an elastic member 12 to the beam 11. The third process 43 is a process to place a spacer part 20 on the beam 11. The fourth process 44 is a process to install a floor panel 13. The fifth process 45 is a process to place material 15 on a floor panel 13A. The sixth process 46 is a process to bond fireproof material 17 to the beam 11. The seventh process 47 is a process to use the material 15. The eighth process 48 is a process to pull out the spacer part 20 placed between the beam 11 and the floor panel 13.SELECTED DRAWING: Figure 8
【課題】弾性部材が許容値を超えて圧縮されることを抑制する。【解決手段】床施工方法40は、第1工程41〜第8工程48を備える。第1工程41は、梁11を固定する工程である。第2工程42は、梁11に弾性部材12を貼着する工程である。第3工程43は、梁11にスペーサー金具20を載置する工程である。第4工程44は、床パネル13を設置する工程である。第5工程45は、資材15を床パネル13Aに載置する工程である。第6工程46は、梁11に防火材17を貼着する工程である。第7工程47は、資材15を使用する工程である。第8工程48は、梁11と床パネル13との間からスペーサー金具20を引き抜く工程である。【選択図】図8
FLOOR CONSTRUCTION METHOD AND SPACER PART
床施工方法及びスペーサー金具
HASHIMOTO TOMOSHIGE (author) / NISHINO KOICHI (author) / TOYOSHIMA KAZUYA (author) / TAJIMA HIROKI (author) / USHIO SHINNOSUKE (author)
2018-12-06
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
European Patent Office | 2021
|Building floor backfill spacer process method and building floor backfill spacer structure
European Patent Office | 2015
|European Patent Office | 2021
|European Patent Office | 2021
|