A platform for research: civil engineering, architecture and urbanism
ERECTION METHOD
To provide a technique for an erection method to connect beams with an erected column member after the column member is erected, which can improve transport efficiency even when the column member through a plurality of floors is used while realizing erection processes to be efficiently performed.SOLUTION: A erection method to connect beams 30, 35 with an erected column member 1 after the erected column member 1 is erected comprises: a process to configure the column member 1 through a plurality of floors as a bracket type beam connecting part 10 to connect beams to a bracket 11 formed by protruding a beam connecting part of some of floors from the column 1; and a process to erect a beam connecting part of the other floors in a status that it is configured as a non-bracket beam connecting part 20 which connects the beams to an outer surface of the column member 1.SELECTED DRAWING: Figure 1
【課題】柱部材を建て込み、当該建て込まれた柱部材に梁を接合する建方工法において、建て込み作業の高効率化を実現しながらも、複数の階層にわたる柱部材を利用する場合であっても運搬効率を向上することができる技術を提供する。【解決手段】柱部材1を建て込み、当該建て込まれた柱部材1に梁30,35を接合する建方工法であって、複数の階層にわたる柱部材1を、一部の階層の梁接合部を柱部材1から突出形成されたブラケット11に梁を接合するブラケット式梁接合部10として構成すると共に、他部の階層の梁接合部を柱部材1の外表面に梁を接合するノンブラケット式梁接合部20として構成した状態で建て込む。【選択図】図1
ERECTION METHOD
To provide a technique for an erection method to connect beams with an erected column member after the column member is erected, which can improve transport efficiency even when the column member through a plurality of floors is used while realizing erection processes to be efficiently performed.SOLUTION: A erection method to connect beams 30, 35 with an erected column member 1 after the erected column member 1 is erected comprises: a process to configure the column member 1 through a plurality of floors as a bracket type beam connecting part 10 to connect beams to a bracket 11 formed by protruding a beam connecting part of some of floors from the column 1; and a process to erect a beam connecting part of the other floors in a status that it is configured as a non-bracket beam connecting part 20 which connects the beams to an outer surface of the column member 1.SELECTED DRAWING: Figure 1
【課題】柱部材を建て込み、当該建て込まれた柱部材に梁を接合する建方工法において、建て込み作業の高効率化を実現しながらも、複数の階層にわたる柱部材を利用する場合であっても運搬効率を向上することができる技術を提供する。【解決手段】柱部材1を建て込み、当該建て込まれた柱部材1に梁30,35を接合する建方工法であって、複数の階層にわたる柱部材1を、一部の階層の梁接合部を柱部材1から突出形成されたブラケット11に梁を接合するブラケット式梁接合部10として構成すると共に、他部の階層の梁接合部を柱部材1の外表面に梁を接合するノンブラケット式梁接合部20として構成した状態で建て込む。【選択図】図1
ERECTION METHOD
建方工法
TANAKA KENJI (author) / YAMAMOTO SHUNJI (author) / AKAZAWA SUKETAKA (author) / ICHITSUBO YURI (author) / KOYAMA MASAKI (author)
2018-12-06
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CANTILEVER ERECTION DEVICE AND CANTILEVER ERECTION METHOD
European Patent Office | 2017
|