ERECTION METHOD
To provide an erection method which makes it possible to complete the Work within a limited time even if the restriction on time is tight.SOLUTION: An erection method according to an embodiment is an erection method for erecting a construction girder 1 of a track on which a track skeleton is placed, comprising the steps of: installing a track skeleton temporary support girder 10 including a track skeleton 11 on a construction girder 1; erecting the construction girder 1 and restoring the track with the track skeleton temporary support girder 10 placed temporarily; removing the track skeleton temporary support girder 10 from the construction girder 1; bringing a noise reduction component inside the construction girder 1; and installing the track skeleton on the noise reduction component.SELECTED DRAWING: Figure 5
【課題】時間の制約が厳しい場合であっても、限られた時間内に作業を完了させることができる架設方法を提供する。【解決手段】一実施形態に係る架設方法は、軌きょうが載せられた軌道の工事桁1を架設する架設方法であって、工事桁1に、軌きょう11を含む軌きょう仮受け桁10を設置する工程と、軌きょう仮受け桁10が一時的に載せられた状態において、工事桁1を架設して軌道を復旧する工程と、工事桁1から軌きょう仮受け桁10を撤去する工程と、工事桁1の内部に騒音低減部材を搬入する工程と、騒音低減部材の上に軌きょうを設置する工程と、を備える。【選択図】図5
ERECTION METHOD
To provide an erection method which makes it possible to complete the Work within a limited time even if the restriction on time is tight.SOLUTION: An erection method according to an embodiment is an erection method for erecting a construction girder 1 of a track on which a track skeleton is placed, comprising the steps of: installing a track skeleton temporary support girder 10 including a track skeleton 11 on a construction girder 1; erecting the construction girder 1 and restoring the track with the track skeleton temporary support girder 10 placed temporarily; removing the track skeleton temporary support girder 10 from the construction girder 1; bringing a noise reduction component inside the construction girder 1; and installing the track skeleton on the noise reduction component.SELECTED DRAWING: Figure 5
【課題】時間の制約が厳しい場合であっても、限られた時間内に作業を完了させることができる架設方法を提供する。【解決手段】一実施形態に係る架設方法は、軌きょうが載せられた軌道の工事桁1を架設する架設方法であって、工事桁1に、軌きょう11を含む軌きょう仮受け桁10を設置する工程と、軌きょう仮受け桁10が一時的に載せられた状態において、工事桁1を架設して軌道を復旧する工程と、工事桁1から軌きょう仮受け桁10を撤去する工程と、工事桁1の内部に騒音低減部材を搬入する工程と、騒音低減部材の上に軌きょうを設置する工程と、を備える。【選択図】図5
ERECTION METHOD
架設方法
EGUCHI HAJIME (author) / IDE YUSUKE (author)
2020-06-04
Patent
Electronic Resource
Japanese
CANTILEVER ERECTION DEVICE AND CANTILEVER ERECTION METHOD
European Patent Office | 2017
|