A platform for research: civil engineering, architecture and urbanism
SLOPE COVERING MAT
To provide rescue means in a slope covering structure in order to prevent a drowning accident by falling from a slope in a reservoir and the like.SOLUTION: A fabric formwork with a flat bag-shaped as a whole in which laminated woven fabrics are connected by connecting strings of a predetermined length is laid on a slope 2 of a reservoir 1. A mortar is filled into the inside of the fabric formwork, which makes a mortar mat with a predetermined thickness after hardening, and the mortar mat constructs a slope covering structure. There, rope holding portions 30 including passing spaces of ropes 20 are formed in the woven fabric at an upper face side of the fabric formwork with a predetermined interval in vertical and horizontal directions. The ropes 20 for rescue are extended between the rope holding portions 30 in a state where the rope holding portions 30 are held in the mat.SELECTED DRAWING: Figure 1
【課題】 ため池等における法面からの転落による水難事故を防止するために、法面被覆構造に救助手段を備えるようにする。【解決手段】 所定長さの接合糸で重ねられた織布間が連結されて全体が扁平な袋状をなした布製型枠をため池1の法面2上に敷設し、その内部にモルタルを充填し、硬化後に所定厚さのモルタルマットとし、このモルタルマットで法面被覆構造を構築する。その際、布製型枠の上面側の織布に、縦横方向に所定間隔をあけてロープ20の通過空間を有するロープ保持部30を形成し、ロープ保持部30がマット内に保持された状態でロープ保持部30間に救助用のロープ20を張設する。【選択図】 図1
SLOPE COVERING MAT
To provide rescue means in a slope covering structure in order to prevent a drowning accident by falling from a slope in a reservoir and the like.SOLUTION: A fabric formwork with a flat bag-shaped as a whole in which laminated woven fabrics are connected by connecting strings of a predetermined length is laid on a slope 2 of a reservoir 1. A mortar is filled into the inside of the fabric formwork, which makes a mortar mat with a predetermined thickness after hardening, and the mortar mat constructs a slope covering structure. There, rope holding portions 30 including passing spaces of ropes 20 are formed in the woven fabric at an upper face side of the fabric formwork with a predetermined interval in vertical and horizontal directions. The ropes 20 for rescue are extended between the rope holding portions 30 in a state where the rope holding portions 30 are held in the mat.SELECTED DRAWING: Figure 1
【課題】 ため池等における法面からの転落による水難事故を防止するために、法面被覆構造に救助手段を備えるようにする。【解決手段】 所定長さの接合糸で重ねられた織布間が連結されて全体が扁平な袋状をなした布製型枠をため池1の法面2上に敷設し、その内部にモルタルを充填し、硬化後に所定厚さのモルタルマットとし、このモルタルマットで法面被覆構造を構築する。その際、布製型枠の上面側の織布に、縦横方向に所定間隔をあけてロープ20の通過空間を有するロープ保持部30を形成し、ロープ保持部30がマット内に保持された状態でロープ保持部30間に救助用のロープ20を張設する。【選択図】 図1
SLOPE COVERING MAT
法面被覆マット
YAMAMOTO KOJI (author) / KAWAGISHI YASUSHI (author) / ISHIDA MASATOSHI (author)
2019-01-10
Patent
Electronic Resource
Japanese
Slope mulching film covering layer system and slope restoration method
European Patent Office | 2020
|