A platform for research: civil engineering, architecture and urbanism
CONCRETE FLOOR SLAB CONSTRUCTION METHOD
To apply prestress without connecting post-tension members with each other while improving flexibility in the use of a concrete floor slab during construction.SOLUTION: As a first concrete floor slab 10 prior to performing a removal process is prestressed by a first post-tension member, the flexibility of use for the concrete floor slab during construction can be improved. In the removal process, the first post-tension member is removed from the first concrete floor slab 10. In an insertion process, a second post-tension member extending between the first concrete floor slab 10 and a second concrete floor slab 20 is inserted into the first concrete floor slab 10 and the second concrete floor slab 20. In a prestress application process, prestress is applied to the first concrete floor slab 10 and the second concrete floor slab 20 by the second post-tension member, thus making it possible to apply prestress without connecting the post-tension members to each other.SELECTED DRAWING: Figure 9
【課題】施工時におけるコンクリート床版の使用の自由度を向上させつつ、ポストテンション材同士を連結しないでプレストレスを付与する。【解決手段】抜去工程が行われる前の第1コンクリート床版10は、第1ポストテンション材によりプレストレスを付与されているため、施工時におけるコンクリート床版の使用の自由度を向上させることができる。抜去工程では、第1コンクリート床版10から第1ポストテンション材が抜去され、挿入工程では、第1コンクリート床版10と第2コンクリート床版20とに、第1コンクリート床版10と第2コンクリート床版20とに亘って延在する第2ポストテンション材が挿入され、プレストレス付与工程では、第2ポストテンション材により、第1コンクリート床版10と第2コンクリート床版20とにプレストレスが付与されるため、ポストテンション材同士を連結しないでプレストレスを付与することができる。【選択図】図9
CONCRETE FLOOR SLAB CONSTRUCTION METHOD
To apply prestress without connecting post-tension members with each other while improving flexibility in the use of a concrete floor slab during construction.SOLUTION: As a first concrete floor slab 10 prior to performing a removal process is prestressed by a first post-tension member, the flexibility of use for the concrete floor slab during construction can be improved. In the removal process, the first post-tension member is removed from the first concrete floor slab 10. In an insertion process, a second post-tension member extending between the first concrete floor slab 10 and a second concrete floor slab 20 is inserted into the first concrete floor slab 10 and the second concrete floor slab 20. In a prestress application process, prestress is applied to the first concrete floor slab 10 and the second concrete floor slab 20 by the second post-tension member, thus making it possible to apply prestress without connecting the post-tension members to each other.SELECTED DRAWING: Figure 9
【課題】施工時におけるコンクリート床版の使用の自由度を向上させつつ、ポストテンション材同士を連結しないでプレストレスを付与する。【解決手段】抜去工程が行われる前の第1コンクリート床版10は、第1ポストテンション材によりプレストレスを付与されているため、施工時におけるコンクリート床版の使用の自由度を向上させることができる。抜去工程では、第1コンクリート床版10から第1ポストテンション材が抜去され、挿入工程では、第1コンクリート床版10と第2コンクリート床版20とに、第1コンクリート床版10と第2コンクリート床版20とに亘って延在する第2ポストテンション材が挿入され、プレストレス付与工程では、第2ポストテンション材により、第1コンクリート床版10と第2コンクリート床版20とにプレストレスが付与されるため、ポストテンション材同士を連結しないでプレストレスを付与することができる。【選択図】図9
CONCRETE FLOOR SLAB CONSTRUCTION METHOD
コンクリート床版の施工方法
FUJISHIRO MASARU (author) / ITO KOSUKE (author)
2019-01-31
Patent
Electronic Resource
Japanese
IPC:
E01D
BRIDGES
,
Brücken
CONCRETE FLOOR SLAB REMOVAL METHOD AND CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2018
|LIGHTWEIGHT CONCRETE FLOOR SLAB AND LIGHTWEIGHT CONCRETE FLOOR SLAB CONSTRUCTION METHOD
European Patent Office | 2023
|Construction method and construction device of concrete floor slab and concrete floor slab
European Patent Office | 2023
|European Patent Office | 2020
|