A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD OF ARTIFICIAL ISLAND
To provide a method of efficiently constructing an artificial island by efficiently performing selection of size of concrete waste materials and utilizing concrete waste materials with each selected size.SOLUTION: An artificial island is constructed by: selecting concrete waste materials with each predetermined size that are transported by a middle-sized factory ship using a waterway at a work base for a harbor; depositing the concrete waste materials in descending order of size at a height of at least a few meters from sea level and at a width of a few meters or more, sequentially from a coral reef area or a lagoon area adjacent to the work base for a harbor toward more distant area, on the coral reef or in the lagoon, to construct an annular bank; making cement slurry flow into the bank from a surface of the deposited bank, to connect the concrete waste materials with each other and to fix the whole bank; and reclaiming the inside of the bank.SELECTED DRAWING: Figure 1
【課題】 コンクリート廃材を効率的に大きさの選別を行い、選別した大きさごとのコンクリート廃材を活用して効率的に人工島を造成する方法を提供することを目的とする。【解決手段】 水路を利用して前記中型工作船によって運搬されたコンクリート廃材を前記港湾用作業基地で所定の大きさごとに選別し、前記港湾用作業基地に隣接する前記サンゴ礁の区域あるいは前記礁湖区域から順次遠ざかる区域向かって、前記サンゴ礁上あるいは前記礁湖中に前記大きいコンクリート廃材から順に少なくとも海面上数メートルの高さ、幅数メール以上に堆積させ、環状の堤防を構築し、堆積が完了した堤防の表面から堤防内にセメントスラリーを流し込んで前記コンクリート廃材同士を繋ぎとめ、かつ、前記堤防全体を固定化し、前記堤防の内側を埋め立てることで人工島の造成を行うことを特徴とする。【選択図】図1
CONSTRUCTION METHOD OF ARTIFICIAL ISLAND
To provide a method of efficiently constructing an artificial island by efficiently performing selection of size of concrete waste materials and utilizing concrete waste materials with each selected size.SOLUTION: An artificial island is constructed by: selecting concrete waste materials with each predetermined size that are transported by a middle-sized factory ship using a waterway at a work base for a harbor; depositing the concrete waste materials in descending order of size at a height of at least a few meters from sea level and at a width of a few meters or more, sequentially from a coral reef area or a lagoon area adjacent to the work base for a harbor toward more distant area, on the coral reef or in the lagoon, to construct an annular bank; making cement slurry flow into the bank from a surface of the deposited bank, to connect the concrete waste materials with each other and to fix the whole bank; and reclaiming the inside of the bank.SELECTED DRAWING: Figure 1
【課題】 コンクリート廃材を効率的に大きさの選別を行い、選別した大きさごとのコンクリート廃材を活用して効率的に人工島を造成する方法を提供することを目的とする。【解決手段】 水路を利用して前記中型工作船によって運搬されたコンクリート廃材を前記港湾用作業基地で所定の大きさごとに選別し、前記港湾用作業基地に隣接する前記サンゴ礁の区域あるいは前記礁湖区域から順次遠ざかる区域向かって、前記サンゴ礁上あるいは前記礁湖中に前記大きいコンクリート廃材から順に少なくとも海面上数メートルの高さ、幅数メール以上に堆積させ、環状の堤防を構築し、堆積が完了した堤防の表面から堤防内にセメントスラリーを流し込んで前記コンクリート廃材同士を繋ぎとめ、かつ、前記堤防全体を固定化し、前記堤防の内側を埋め立てることで人工島の造成を行うことを特徴とする。【選択図】図1
CONSTRUCTION METHOD OF ARTIFICIAL ISLAND
人工島の造成方法
TATEISHI ISAO (author)
2019-04-11
Patent
Electronic Resource
Japanese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
BIOSWALE CONSTRUCTION METHOD USING ARTIFICIAL FLOATING ISLAND
European Patent Office | 2018
|COFFERDAM-FREE RECLAMATION CONSTRUCTION METHOD FOR ARTIFICIAL ISLAND
European Patent Office | 2024
|