CONSTRUCTION METHOD OF TUNNEL LINING AND FORM FOR TUNNEL LINING CONCRETE
To provide a construction method of a tunnel lining capable of easily carrying out sealing curing or water holding curing continuously after the slide center removal, and a formwork for tunnel lining concrete suitable for the construction method.SOLUTION: A construction method of tunnel lining comprises a formwork assembling step of installing a tunnel lining concrete formwork in a borehole, a placing step of placing concrete C between an inner wall surface of the borehole and the tunnel lining concrete formwork, a formwork removing step for removing tunnel lining concrete formwork, and a curing step of curing concrete C. The tunnel lining concrete formwork has an upper form, a middle form 12 and a lower form 13. In the formwork assembling step, a water permeable formwork 3 is attached to an outer surface of the lower form 13 so as to be flush with the middle form 12, and the water permeable form 3 is left in the formwork removing step.SELECTED DRAWING: Figure 2
【課題】スライドセントルの脱型後に連続して封緘養生または保水養生を簡易に実施することが可能なトンネル覆工体の施工方法、及び当該施工方法に好適なトンネル覆工コンクリート用型枠を提供する。【解決手段】トンネル覆工コンクリート用型枠を掘削孔内に据え付ける型枠組立工程と、掘削孔の内壁面とトンネル覆工コンクリート用型枠との間にコンクリートCを打設する打設工程と、トンネル覆工コンクリート用型枠を撤去する脱型工程と、コンクリートCを養生する養生工程とを備えるトンネル覆工体の施工方法である。トンネル覆工コンクリート用型枠は、上部フォームと、中部フォーム12と、下部フォーム13とを有しており、型枠組立工程では、中部フォーム12と面一になるように下部フォーム13の外面に透水型枠3を取り付けておき、脱型工程では透水型枠3を残置させておく。【選択図】図2
CONSTRUCTION METHOD OF TUNNEL LINING AND FORM FOR TUNNEL LINING CONCRETE
To provide a construction method of a tunnel lining capable of easily carrying out sealing curing or water holding curing continuously after the slide center removal, and a formwork for tunnel lining concrete suitable for the construction method.SOLUTION: A construction method of tunnel lining comprises a formwork assembling step of installing a tunnel lining concrete formwork in a borehole, a placing step of placing concrete C between an inner wall surface of the borehole and the tunnel lining concrete formwork, a formwork removing step for removing tunnel lining concrete formwork, and a curing step of curing concrete C. The tunnel lining concrete formwork has an upper form, a middle form 12 and a lower form 13. In the formwork assembling step, a water permeable formwork 3 is attached to an outer surface of the lower form 13 so as to be flush with the middle form 12, and the water permeable form 3 is left in the formwork removing step.SELECTED DRAWING: Figure 2
【課題】スライドセントルの脱型後に連続して封緘養生または保水養生を簡易に実施することが可能なトンネル覆工体の施工方法、及び当該施工方法に好適なトンネル覆工コンクリート用型枠を提供する。【解決手段】トンネル覆工コンクリート用型枠を掘削孔内に据え付ける型枠組立工程と、掘削孔の内壁面とトンネル覆工コンクリート用型枠との間にコンクリートCを打設する打設工程と、トンネル覆工コンクリート用型枠を撤去する脱型工程と、コンクリートCを養生する養生工程とを備えるトンネル覆工体の施工方法である。トンネル覆工コンクリート用型枠は、上部フォームと、中部フォーム12と、下部フォーム13とを有しており、型枠組立工程では、中部フォーム12と面一になるように下部フォーム13の外面に透水型枠3を取り付けておき、脱型工程では透水型枠3を残置させておく。【選択図】図2
CONSTRUCTION METHOD OF TUNNEL LINING AND FORM FOR TUNNEL LINING CONCRETE
トンネル覆工体の施工方法およびトンネル覆工コンクリート用型枠
USUI TATSUYA (author) / MORISHIMA SHINGO (author) / SUZUKI OSAMU (author) / KOSHU MAKOTO (author) / NAKAJIMA YUICHIRO (author) / HONDA HIDEO (author) / HISATOMI YUTA (author)
2019-06-06
Patent
Electronic Resource
Japanese
TUNNEL LINING CONCRETE AND CONSTRUCTION METHOD OF LINING CONCRETE
European Patent Office | 2017
|CONSTRUCTION METHOD OF TUNNEL LINING CONCRETE AND ADHESION INHIBITOR FOR TUNNEL LINING CONCRETE