A platform for research: civil engineering, architecture and urbanism
To provide an installing method and structure of a support post for improving the strength against drawing.SOLUTION: The present invention comprises a support post installation step S4 in which a support post having an outer diameter smaller compared to an inner diameter of a hole and being longer compared to a depth of the hole is installed in the hole, a cement placement step S5 for placing cement into the holes, a pipe setting step S6 for covering the support post so that a lower end of a pipe reaches cement and a part of an upper part of the pipe is exposed to the ground in which the pipe has a smaller outer diameter compared to the inner diameter of the hole, a larger inner diameter compared to the outer diameter of the support post, and a shorter length compared to the support post, a cement placement step S7 for filling the space between the pipe and the support post by placing cement into the pipe, and a burying step S8 for filling the space between the wall of the hole and the pipe by placing the soil into the hole.SELECTED DRAWING: Figure 1
【課題】引抜きに対する強度を向上させる支柱の設置方法及び構造を提供する。【解決手段】穴の内径と比較して外径が小さく、且つ穴の深度と比較して長い支柱を穴の中に設置する支柱設置工程S4と、穴の中にセメントを投入するセメント投入工程S5と、穴の内径と比較して外径が小さく、支柱の外径と比較して内径が大きく、且つ支柱と比較して短いパイプを、パイプの下端がセメントに到達すると共にパイプの上方の一部分が地上に露出するように支柱を覆うパイプ設置工程S6と、パイプの中にセメントを投入することで、パイプ及び支柱の間を埋めるセメント投入工程S7と、穴の中に土砂を投入することで、穴の壁及びパイプの間を埋める埋設工程S8と、を備える。【選択図】図1
To provide an installing method and structure of a support post for improving the strength against drawing.SOLUTION: The present invention comprises a support post installation step S4 in which a support post having an outer diameter smaller compared to an inner diameter of a hole and being longer compared to a depth of the hole is installed in the hole, a cement placement step S5 for placing cement into the holes, a pipe setting step S6 for covering the support post so that a lower end of a pipe reaches cement and a part of an upper part of the pipe is exposed to the ground in which the pipe has a smaller outer diameter compared to the inner diameter of the hole, a larger inner diameter compared to the outer diameter of the support post, and a shorter length compared to the support post, a cement placement step S7 for filling the space between the pipe and the support post by placing cement into the pipe, and a burying step S8 for filling the space between the wall of the hole and the pipe by placing the soil into the hole.SELECTED DRAWING: Figure 1
【課題】引抜きに対する強度を向上させる支柱の設置方法及び構造を提供する。【解決手段】穴の内径と比較して外径が小さく、且つ穴の深度と比較して長い支柱を穴の中に設置する支柱設置工程S4と、穴の中にセメントを投入するセメント投入工程S5と、穴の内径と比較して外径が小さく、支柱の外径と比較して内径が大きく、且つ支柱と比較して短いパイプを、パイプの下端がセメントに到達すると共にパイプの上方の一部分が地上に露出するように支柱を覆うパイプ設置工程S6と、パイプの中にセメントを投入することで、パイプ及び支柱の間を埋めるセメント投入工程S7と、穴の中に土砂を投入することで、穴の壁及びパイプの間を埋める埋設工程S8と、を備える。【選択図】図1
INSTALLING METHOD OF SUPPORT POST
支柱の設置方法
SATO KATSUHIKO (author)
2019-06-13
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2024
|Installing the support columns
British Library Online Contents | 2002
Auxiliary keel installing support, installing structure between auxiliary keels and method
European Patent Office | 2015
|