A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR WOODEN FRAMEWORK BUILDING
To provide a construction method for a wooden framework building excellent in workability and durability capable of greatly reducing the number of parts and the number of working steps by reducing working and assembling operations at the site as much as possible by using a member previously produced in a factory, and capable of safely performing work in a short construction period.SOLUTION: A first step for mounting a foundation 12 and a sleeper 13 on a base 10; a second step in which a floor panel 15 is mounted on the sleeper 13 to cover a space 14 surrounded by the base 10 and the foundation 12; a third step in which a plurality of pillars 25, 26 are erected on the foundation 12 at intervals and connected by a horizontal member 27; a fourth step of attaching wall panels 31, 31a to at least a portion of a plurality of side openings 30 surrounded by the foundation 12, pillars 25, 26, and the horizontal member 27; and a fifth step of attaching a roof panel 50 to a horizontal member 28 via a roof supporting member 48 are provided.SELECTED DRAWING: Figure 7
【課題】予め工場生産された部材を使用することにより、現場での加工及び組立作業を極力減らして、部品点数及び作業工数を大幅に削減することができ、短い工期で安全に作業することが可能な施工性、耐久性に優れた木造軸組建築物の施工方法を提供する。【解決手段】基礎10の上に土台12及び大引き13を取り付ける第1の工程と、大引き13上に床パネル15を取り付けて基礎10及び土台12で囲まれた空間部14を覆う第2の工程と、土台12上に間隔を空けて複数の柱25、26を立設し、水平材27で連結する第3の工程と、土台12、柱25、26、及び水平材27で囲まれた複数の側方開口部30の少なくとも一部に壁パネル31、31aを取り付ける第4の工程と、水平材28上に屋根支持材48を介して屋根パネル50を取り付ける第5の工程とを有する。【選択図】図7
CONSTRUCTION METHOD FOR WOODEN FRAMEWORK BUILDING
To provide a construction method for a wooden framework building excellent in workability and durability capable of greatly reducing the number of parts and the number of working steps by reducing working and assembling operations at the site as much as possible by using a member previously produced in a factory, and capable of safely performing work in a short construction period.SOLUTION: A first step for mounting a foundation 12 and a sleeper 13 on a base 10; a second step in which a floor panel 15 is mounted on the sleeper 13 to cover a space 14 surrounded by the base 10 and the foundation 12; a third step in which a plurality of pillars 25, 26 are erected on the foundation 12 at intervals and connected by a horizontal member 27; a fourth step of attaching wall panels 31, 31a to at least a portion of a plurality of side openings 30 surrounded by the foundation 12, pillars 25, 26, and the horizontal member 27; and a fifth step of attaching a roof panel 50 to a horizontal member 28 via a roof supporting member 48 are provided.SELECTED DRAWING: Figure 7
【課題】予め工場生産された部材を使用することにより、現場での加工及び組立作業を極力減らして、部品点数及び作業工数を大幅に削減することができ、短い工期で安全に作業することが可能な施工性、耐久性に優れた木造軸組建築物の施工方法を提供する。【解決手段】基礎10の上に土台12及び大引き13を取り付ける第1の工程と、大引き13上に床パネル15を取り付けて基礎10及び土台12で囲まれた空間部14を覆う第2の工程と、土台12上に間隔を空けて複数の柱25、26を立設し、水平材27で連結する第3の工程と、土台12、柱25、26、及び水平材27で囲まれた複数の側方開口部30の少なくとも一部に壁パネル31、31aを取り付ける第4の工程と、水平材28上に屋根支持材48を介して屋根パネル50を取り付ける第5の工程とを有する。【選択図】図7
CONSTRUCTION METHOD FOR WOODEN FRAMEWORK BUILDING
木造軸組建築物の施工方法
NAKAI TORANOSUKE (author)
2019-09-19
Patent
Electronic Resource
Japanese
LAYERED WOODEN BUILDING USING WOODEN UNIT, AND CONSTRUCTION METHOD OF LAYERED WOODEN BUILDING
European Patent Office | 2018
|