A platform for research: civil engineering, architecture and urbanism
FIXTURE AND INSTALLATION METHOD OF COLUMN
To provide a fixture and an installation method of a column allowing both of inserting a woody column as maintaining its strength and excellent workability to be realized.SOLUTION: A fixture 100 to install a column at a predetermined position by being inserted in a circular hole bored in a basement of the column is provided with a bottom plate part 10 fixed on the predetermined position using a fixing member 6 and a plurality of vertical erected plate parts 20, 40 connected to the bottom plate part 10 and inserted in the circular hole in an erected state from the bottom plate part 10 and abutting an inner surface of the circular hole at three points or more in a plan view.SELECTED DRAWING: Figure 2
【課題】木質の柱の強度を保って挿入できる点と、優れた施工性とを両立できる、固定金具及び支柱の設置方法を提供する。【解決手段】支柱の基部に形成された丸穴に挿入し、支柱を所定箇所に設置するための固定金具100であって、係止部材6を用いて所定箇所に固定される底板部10と、底板部10に連結され、底板部10から立ち上がった状態で丸穴に挿入されて、丸穴の内面に平面視3点以上で接する複数の立体板部20,40とを有する。【選択図】図2
FIXTURE AND INSTALLATION METHOD OF COLUMN
To provide a fixture and an installation method of a column allowing both of inserting a woody column as maintaining its strength and excellent workability to be realized.SOLUTION: A fixture 100 to install a column at a predetermined position by being inserted in a circular hole bored in a basement of the column is provided with a bottom plate part 10 fixed on the predetermined position using a fixing member 6 and a plurality of vertical erected plate parts 20, 40 connected to the bottom plate part 10 and inserted in the circular hole in an erected state from the bottom plate part 10 and abutting an inner surface of the circular hole at three points or more in a plan view.SELECTED DRAWING: Figure 2
【課題】木質の柱の強度を保って挿入できる点と、優れた施工性とを両立できる、固定金具及び支柱の設置方法を提供する。【解決手段】支柱の基部に形成された丸穴に挿入し、支柱を所定箇所に設置するための固定金具100であって、係止部材6を用いて所定箇所に固定される底板部10と、底板部10に連結され、底板部10から立ち上がった状態で丸穴に挿入されて、丸穴の内面に平面視3点以上で接する複数の立体板部20,40とを有する。【選択図】図2
FIXTURE AND INSTALLATION METHOD OF COLUMN
固定金具及び支柱の設置方法
SUGAWARA KOJI (author) / MOCHIDA HIROSHI (author)
2019-10-17
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Steel column installation correction fixture, correction system and correction method
European Patent Office | 2021
|COLUMN FIXTURE, MANUFACTURING METHOD OF COLUMN FIXTURE, AND BUILDING
European Patent Office | 2024
|