A platform for research: civil engineering, architecture and urbanism
WEIGHT BALANCE IMMERSION METHOD
To provide a weight balance immersion method that can early stop groundwater from rising after constructing an underground skeleton.SOLUTION: An immersion method for preventing an underground skeleton 20 from lifting due to the buoyancy of groundwater when constructing the underground skeleton 20, includes a step for installing drainage equipment 18 underground for discharging to the outside groundwater below a region A where the underground skeleton 20 is to be constructed; a step for afterwards adding, to the underground skeleton 20, weight water 28 for balancing for resisting the buoyancy of groundwater while operating the drainage equipment 18 and constructing the underground skeleton 20; and a step for afterwards stopping the functions of the drainage equipment 18 when the weight of the underground skeleton 20 with the weight water 28 added exceeds the buoyancy of groundwater.SELECTED DRAWING: Figure 1
【課題】地下躯体を構築した後に、早期に地下水の揚水を停止することのできるウェイトバランス水浸工法を提供する。【解決手段】地下躯体20を構築する際に、地下水の浮力による地下躯体20の浮き上がりを防止する水浸工法であって、地下躯体20を構築する領域Aの下側の地下水を外部に排水するための排水設備18を地中に設置するステップと、その後、排水設備18を稼働しながら地下躯体20を構築する一方で、地下水の浮力に対抗させるためのバランス用のウェイト水28を地下躯体20に付加するステップと、その後、ウェイト水28を付加した地下躯体20の重量が地下水の浮力を上回った場合に、排水設備18の機能を停止するステップとを備えるようにする。【選択図】図1
WEIGHT BALANCE IMMERSION METHOD
To provide a weight balance immersion method that can early stop groundwater from rising after constructing an underground skeleton.SOLUTION: An immersion method for preventing an underground skeleton 20 from lifting due to the buoyancy of groundwater when constructing the underground skeleton 20, includes a step for installing drainage equipment 18 underground for discharging to the outside groundwater below a region A where the underground skeleton 20 is to be constructed; a step for afterwards adding, to the underground skeleton 20, weight water 28 for balancing for resisting the buoyancy of groundwater while operating the drainage equipment 18 and constructing the underground skeleton 20; and a step for afterwards stopping the functions of the drainage equipment 18 when the weight of the underground skeleton 20 with the weight water 28 added exceeds the buoyancy of groundwater.SELECTED DRAWING: Figure 1
【課題】地下躯体を構築した後に、早期に地下水の揚水を停止することのできるウェイトバランス水浸工法を提供する。【解決手段】地下躯体20を構築する際に、地下水の浮力による地下躯体20の浮き上がりを防止する水浸工法であって、地下躯体20を構築する領域Aの下側の地下水を外部に排水するための排水設備18を地中に設置するステップと、その後、排水設備18を稼働しながら地下躯体20を構築する一方で、地下水の浮力に対抗させるためのバランス用のウェイト水28を地下躯体20に付加するステップと、その後、ウェイト水28を付加した地下躯体20の重量が地下水の浮力を上回った場合に、排水設備18の機能を停止するステップとを備えるようにする。【選択図】図1
WEIGHT BALANCE IMMERSION METHOD
ウェイトバランス水浸工法
ISHIKAWA AKIRA (author) / KATO KOJI (author) / FUJIMARU KEIICHI (author) / NISHI HIROYASU (author)
2019-11-21
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
IMMERSION/INSTALLATION METHOD FOR ANCHOR BLOCK HAVING VARYING UNDERWATER WEIGHT
European Patent Office | 2016
|European Patent Office | 2024
|