A platform for research: civil engineering, architecture and urbanism
EAVES FOR BUILDING
To provide eaves for a building capable of excellently draining rain water flowing in a gap between intermediate materials without being incorrectly recognized as leaking even when amount of the rain water is heavy.SOLUTION: Eaves for a building are arranged with an eaves body 3 formed with a plurality of eaves components 5 connected in a width direction, and a tip parting material 4 attached on a forward end part of the eaves body 3 over forward end parts of the plurality of eaves components 5, and are positioned obliquely downward in a direction of a front side. A confluent part 15 arranged at the tip parting material 4 or at a front portion of the tip parting material 4 joins rain water W1 flowing down along an upper surface part 3a of the eaves body 3 and rain water W2 flowing down through a gap between the eaves components 5 to drain confluent water joined at the confluent part 15 from a front edge of the tip parting material 4 or a section of a front portion of the front edge.SELECTED DRAWING: Figure 3
【課題】雨水の量が多い場合でも、中間材同士の間の隙間に流れ込んだ雨水を、雨漏りしていると誤認されることなく、良好に排出できる建物用庇を提供する。【解決手段】複数の庇構成材5が互いに幅方向に連結されてなる庇本体3と、複数の庇構成材5の前端部に跨って庇本体3の前端部に取り付けられる先端見切り材4と、を備え、前側ほど下方となるように傾斜されて配置されている建物用庇であって、先端見切り材4または先端見切り材4の前方に、庇本体3の上面部3aに沿って流れ落ちてきた雨水W1と、庇構成材5同士の間の隙間を通って流れ落ちてきた雨水W2と、を合流させる合流部15が設けられ、合流部15で合わされた雨水を先端見切り材4の前縁または前縁前方箇所から排水する。【選択図】図3
EAVES FOR BUILDING
To provide eaves for a building capable of excellently draining rain water flowing in a gap between intermediate materials without being incorrectly recognized as leaking even when amount of the rain water is heavy.SOLUTION: Eaves for a building are arranged with an eaves body 3 formed with a plurality of eaves components 5 connected in a width direction, and a tip parting material 4 attached on a forward end part of the eaves body 3 over forward end parts of the plurality of eaves components 5, and are positioned obliquely downward in a direction of a front side. A confluent part 15 arranged at the tip parting material 4 or at a front portion of the tip parting material 4 joins rain water W1 flowing down along an upper surface part 3a of the eaves body 3 and rain water W2 flowing down through a gap between the eaves components 5 to drain confluent water joined at the confluent part 15 from a front edge of the tip parting material 4 or a section of a front portion of the front edge.SELECTED DRAWING: Figure 3
【課題】雨水の量が多い場合でも、中間材同士の間の隙間に流れ込んだ雨水を、雨漏りしていると誤認されることなく、良好に排出できる建物用庇を提供する。【解決手段】複数の庇構成材5が互いに幅方向に連結されてなる庇本体3と、複数の庇構成材5の前端部に跨って庇本体3の前端部に取り付けられる先端見切り材4と、を備え、前側ほど下方となるように傾斜されて配置されている建物用庇であって、先端見切り材4または先端見切り材4の前方に、庇本体3の上面部3aに沿って流れ落ちてきた雨水W1と、庇構成材5同士の間の隙間を通って流れ落ちてきた雨水W2と、を合流させる合流部15が設けられ、合流部15で合わされた雨水を先端見切り材4の前縁または前縁前方箇所から排水する。【選択図】図3
EAVES FOR BUILDING
建物用庇
MIYAJI TOSHIHIRO (author) / WATANABE YOSHITAKA (author)
2019-12-26
Patent
Electronic Resource
Japanese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden