DRAIN PIPE LAYING CONSTRUCTION METHOD
To provide a drain pipe laying construction method that is safe, accurate, and easy to construct, and that can shorten a laying construction period and reduce laying construction costs.SOLUTION: A composite pipe 31 has a drain pipe 41 inside a protective pipe 51. When the composite pipe 31 is laid over the entire length of a horizontal shaft 13, the composite pipe 31 is pushed and inserted from one end of the horizontal shaft 13 on a departure shaft 11 to the other end of the horizontal shaft 13 on the arrival shaft. By repeatedly pushing the composite pipe 31 into the horizontal shaft 13, the drain pipe 41 is laid from one end to the other end of the horizontal shaft 13. After the drain pipe 41 is held in the horizontal shaft 13 so that the drain pipe 41 stays in the horizontal shaft, the protective pipe 51 is pulled out from the horizontal shaft 13 to the departure shaft 11 or the arrival shaft 12.SELECTED DRAWING: Figure 7
【課題】安全かつ正確で施工の容易なドレイン管敷、敷設工期の短縮、敷設工事費の低減などをはかることのできるドレイン管敷設工法を提供する。【解決手段】複合管31は保護管51内にドレイン管41を内装してなるものである。複合管31を横坑13の全長にわたって敷設するときに、発進立坑11側にある横坑13の一端部から到達立坑側にある横坑13の他端部に向けて複合管31を押し込み挿入する。横坑13内への複合管31の押し込みを繰り返すことにより、横坑13の一端部から他端部にわたってドレイン管41を敷設する。ドレイン管41が横坑13内に留まるように当該ドレイン管41を横坑内停留状態に保持した後、保護管51を横坑13内から発進立坑11側または到達立坑12側に引き抜き出す。【選択図】図7
DRAIN PIPE LAYING CONSTRUCTION METHOD
To provide a drain pipe laying construction method that is safe, accurate, and easy to construct, and that can shorten a laying construction period and reduce laying construction costs.SOLUTION: A composite pipe 31 has a drain pipe 41 inside a protective pipe 51. When the composite pipe 31 is laid over the entire length of a horizontal shaft 13, the composite pipe 31 is pushed and inserted from one end of the horizontal shaft 13 on a departure shaft 11 to the other end of the horizontal shaft 13 on the arrival shaft. By repeatedly pushing the composite pipe 31 into the horizontal shaft 13, the drain pipe 41 is laid from one end to the other end of the horizontal shaft 13. After the drain pipe 41 is held in the horizontal shaft 13 so that the drain pipe 41 stays in the horizontal shaft, the protective pipe 51 is pulled out from the horizontal shaft 13 to the departure shaft 11 or the arrival shaft 12.SELECTED DRAWING: Figure 7
【課題】安全かつ正確で施工の容易なドレイン管敷、敷設工期の短縮、敷設工事費の低減などをはかることのできるドレイン管敷設工法を提供する。【解決手段】複合管31は保護管51内にドレイン管41を内装してなるものである。複合管31を横坑13の全長にわたって敷設するときに、発進立坑11側にある横坑13の一端部から到達立坑側にある横坑13の他端部に向けて複合管31を押し込み挿入する。横坑13内への複合管31の押し込みを繰り返すことにより、横坑13の一端部から他端部にわたってドレイン管41を敷設する。ドレイン管41が横坑13内に留まるように当該ドレイン管41を横坑内停留状態に保持した後、保護管51を横坑13内から発進立坑11側または到達立坑12側に引き抜き出す。【選択図】図7
DRAIN PIPE LAYING CONSTRUCTION METHOD
ドレイン管敷設工法
HASHIMOTO TAKAO (author) / WAKITA SEIJI (author) / UCHIYAMA TATSUMASA (author) / SHIMIZU TOSHITAKA (author) / TSUTSUMI RYOICHI (author) / ICHINOSE HITOSHI (author) / KANEKO KEITA (author) / AKIYOSHI EIICHI (author) / IWATA TATSUHIRO (author)
2020-03-05
Patent
Electronic Resource
Japanese
DRAIN PIPE, COMMUNICATION PIPE AND LAYING METHOD OF COMMUNICATION PIPE
European Patent Office | 2015
|European Patent Office | 2020
|laying method for a drain pipe in a high-level stream area
European Patent Office | 2020
|