FOUNDATION STRUCTURE, FOOTING MEMBER, AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
To provide a foundation structure, a footing member, and a foundation structure construction method capable of reducing the labor of construction.SOLUTION: A foundation structure that supports a building comprises a precast footing member 1 that is used by being buried in the ground where the building is built. The footing member 1 comprises a footing side through hole 12 through which a pile body supporting a building is inserted, the footing side through hole 12 for adjusting the relative position between the pile body and the footing member 1. A gap between the footing member 1 and the pile body inside the footing side through hole 12 is filled with a filler. One footing side through hole 12 is provided at a position near the center of the footing member 1. The entire area of an upper surface of the footing member 1 is a concrete casting area. A joint is joined to a pile head of the pile body. A reinforcing bar does not project from a side surface of the footing member 1.SELECTED DRAWING: Figure 2
【課題】施工の手間を軽減させることを可能にする基礎構造、フーチング部材、及び基礎構造の施工方法を提供すること。【解決手段】建築物を支持する基礎構造であって、建築物が建築される地盤に埋めて用いられるプレキャスト製のフーチング部材1、を備え、フーチング部材1は、建築物を支持する杭体が挿通されるフーチング側貫通孔12であって、当該杭体と当該フーチング部材1との相対位置を調整するためのフーチング側貫通孔12、を備え、フーチング側貫通孔12の内部におけるフーチング部材1と杭体との間の間隙には、充填剤が充填され、フーチング側貫通孔12は、フーチング部材1における中央寄りの位置に1個設けられており、フーチング部材1における上面の全領域はコンクリートの打設領域となっており、杭体の杭頭には接合体が接合されており、フーチング部材1の側面からは鉄筋が突出していない。【選択図】図2
FOUNDATION STRUCTURE, FOOTING MEMBER, AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
To provide a foundation structure, a footing member, and a foundation structure construction method capable of reducing the labor of construction.SOLUTION: A foundation structure that supports a building comprises a precast footing member 1 that is used by being buried in the ground where the building is built. The footing member 1 comprises a footing side through hole 12 through which a pile body supporting a building is inserted, the footing side through hole 12 for adjusting the relative position between the pile body and the footing member 1. A gap between the footing member 1 and the pile body inside the footing side through hole 12 is filled with a filler. One footing side through hole 12 is provided at a position near the center of the footing member 1. The entire area of an upper surface of the footing member 1 is a concrete casting area. A joint is joined to a pile head of the pile body. A reinforcing bar does not project from a side surface of the footing member 1.SELECTED DRAWING: Figure 2
【課題】施工の手間を軽減させることを可能にする基礎構造、フーチング部材、及び基礎構造の施工方法を提供すること。【解決手段】建築物を支持する基礎構造であって、建築物が建築される地盤に埋めて用いられるプレキャスト製のフーチング部材1、を備え、フーチング部材1は、建築物を支持する杭体が挿通されるフーチング側貫通孔12であって、当該杭体と当該フーチング部材1との相対位置を調整するためのフーチング側貫通孔12、を備え、フーチング側貫通孔12の内部におけるフーチング部材1と杭体との間の間隙には、充填剤が充填され、フーチング側貫通孔12は、フーチング部材1における中央寄りの位置に1個設けられており、フーチング部材1における上面の全領域はコンクリートの打設領域となっており、杭体の杭頭には接合体が接合されており、フーチング部材1の側面からは鉄筋が突出していない。【選択図】図2
FOUNDATION STRUCTURE, FOOTING MEMBER, AND FOUNDATION STRUCTURE CONSTRUCTION METHOD
基礎構造、フーチング部材、及び基礎構造の施工方法
OYAMA TOSHIHARU (author) / HAMADA YUKI (author) / HOSHINO MASAHIRO (author) / FUJII EIJI (author) / SETO JUMPEI (author) / KOMATA MASAYUKI (author) / SHIIGAI HIDEHITO (author) / SUGIMOTO MINAMI (author)
2020-06-04
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
|INDEPENDENT FOOTING FOUNDATION STRUCTURE AND ITS CONSTRUCTION METHOD
European Patent Office | 2020
|CONSTRUCTION METHOD FOR PILE FOUNDATION STRUCTURE, PILE FOUNDATION STRUCTURE AND FOUNDATION MEMBER
European Patent Office | 2016
|