A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR BASE-ISOLATED FOUNDATION STRUCTURE, PRECAST CONCRETE FOUNDATION BLOCK, FORMWORK FOR PRECAST CONCRETE, AND MANUFACTURING METHOD FOR FOUNDATION BLOCK
To provide a construction method for based-isolated foundation structures that can reduce the construction period and cost for installing a base isolator.SOLUTION: The construction method for based-isolated foundation structures includes the steps of: installing a foundation 10 with first reinforcements 14; preparing a foundation block 20 that is pre-casted while having receiving portions 28 and nuts 57; inserting first reinforcements 14 into receiving portions 28 and installing the foundation block 20 on the foundation 10 with a gap; introducing a grout material into joint space and receiving portions 28; and installing a base-isolator on a top surface 21. The receiving portion 28 is formed by an embedded sleeve 56 that extends from a bottom surface 24 in a vertical direction D. A through hole 29 that communicates with the receiving portion 28 opens on an outer peripheral surface 26 of the foundation block 20. The grout material fills the receiving portions 28 and the through holes 29.SELECTED DRAWING: Figure 5
【課題】免震装置を設置するための工期を短縮し、かつ、工事費を抑えることができる免震基礎構造の施工方法を提供する。【解決手段】免震基礎構造の施工方法は、第1鉄筋14を備える基礎10を打設する工程と、受入部28とナット57とを備えるようにプレキャストされた基礎ブロック20を用意する工程と、第1鉄筋14を受入部28に挿入して基礎10の上に隙間をあけて基礎ブロック20を設置する工程と、接合空間及び受入部28にグラウト材を注入する工程と、上面21に免震装置を設置する工程と、を含む。受入部28は、底面24から鉛直方向Dに延びる埋設スリーブ56によって形成される。基礎ブロック20の外周面26には、受入部28に連通する連通孔29が開口する。グラウト材は、受入部28及び連通孔29に充填される。【選択図】図5
CONSTRUCTION METHOD FOR BASE-ISOLATED FOUNDATION STRUCTURE, PRECAST CONCRETE FOUNDATION BLOCK, FORMWORK FOR PRECAST CONCRETE, AND MANUFACTURING METHOD FOR FOUNDATION BLOCK
To provide a construction method for based-isolated foundation structures that can reduce the construction period and cost for installing a base isolator.SOLUTION: The construction method for based-isolated foundation structures includes the steps of: installing a foundation 10 with first reinforcements 14; preparing a foundation block 20 that is pre-casted while having receiving portions 28 and nuts 57; inserting first reinforcements 14 into receiving portions 28 and installing the foundation block 20 on the foundation 10 with a gap; introducing a grout material into joint space and receiving portions 28; and installing a base-isolator on a top surface 21. The receiving portion 28 is formed by an embedded sleeve 56 that extends from a bottom surface 24 in a vertical direction D. A through hole 29 that communicates with the receiving portion 28 opens on an outer peripheral surface 26 of the foundation block 20. The grout material fills the receiving portions 28 and the through holes 29.SELECTED DRAWING: Figure 5
【課題】免震装置を設置するための工期を短縮し、かつ、工事費を抑えることができる免震基礎構造の施工方法を提供する。【解決手段】免震基礎構造の施工方法は、第1鉄筋14を備える基礎10を打設する工程と、受入部28とナット57とを備えるようにプレキャストされた基礎ブロック20を用意する工程と、第1鉄筋14を受入部28に挿入して基礎10の上に隙間をあけて基礎ブロック20を設置する工程と、接合空間及び受入部28にグラウト材を注入する工程と、上面21に免震装置を設置する工程と、を含む。受入部28は、底面24から鉛直方向Dに延びる埋設スリーブ56によって形成される。基礎ブロック20の外周面26には、受入部28に連通する連通孔29が開口する。グラウト材は、受入部28及び連通孔29に充填される。【選択図】図5
CONSTRUCTION METHOD FOR BASE-ISOLATED FOUNDATION STRUCTURE, PRECAST CONCRETE FOUNDATION BLOCK, FORMWORK FOR PRECAST CONCRETE, AND MANUFACTURING METHOD FOR FOUNDATION BLOCK
免震基礎構造の施工方法、プレキャストコンクリート製の基礎ブロック、プレキャストコンクリート用型枠、及び基礎ブロックの製造方法
HOTTA KOJI (author)
2020-07-02
Patent
Electronic Resource
Japanese
METHOD FOR CONSTRUCTING PRECAST CONCRETE FOUNDATION AND PRECAST CONCRETE-MADE FOUNDATION
European Patent Office | 2018
|Precast concrete foundation block and joining structure thereof
European Patent Office | 2021
|PRECAST FOUNDATION STRUCTURE AND PRECAST FOUNDATION CONSTRUCTION METHOD