A platform for research: civil engineering, architecture and urbanism
To provide a replacement type suspended scaffold that can be preferably adopted in a construction environment hard to, directly below a protection work installation portion, transiently arrange the suspended scaffold after basic assembly or to temporarily place it, and an erection method therefor.SOLUTION: An erection method comprises a first replacement step of replacing cables (7) of lifting machines (11) with hanging members (14) of loading and carrying devices (12) after rising a suspended scaffold (1) to a high-place work level by tractive forces of the lifting machines, and a second replacement step of replacing the hanging members of the loading and carrying devices with hanging members (8) for supporting scaffold boards after horizontally or laterally displacing the suspended scaffold to a protection work installation position by the loading and carrying devices.SELECTED DRAWING: Figure 6
【課題】防護工設置部分の直下に地組後の吊り足場を過渡的に配置し又は仮置きすることが困難な工事環境において好適に採用し得る盛替え式の吊り足場及びその架設方法を提供する。【解決手段】揚重機(11)の牽引力によって吊り足場(1)を高所作業レベルに上昇させた後、揚重機の索条(7)を荷役・運搬装置(12)の懸吊部材(14)に盛替える第1の盛替工程と、荷役・運搬装置によって吊り足場を防護工設置位置に水平移動又は横移動させた後、荷役・運搬装置の懸吊部材を足場板支持用の懸吊部材(8)に盛替える第2の盛替工程とが実施される。【選択図】図6
To provide a replacement type suspended scaffold that can be preferably adopted in a construction environment hard to, directly below a protection work installation portion, transiently arrange the suspended scaffold after basic assembly or to temporarily place it, and an erection method therefor.SOLUTION: An erection method comprises a first replacement step of replacing cables (7) of lifting machines (11) with hanging members (14) of loading and carrying devices (12) after rising a suspended scaffold (1) to a high-place work level by tractive forces of the lifting machines, and a second replacement step of replacing the hanging members of the loading and carrying devices with hanging members (8) for supporting scaffold boards after horizontally or laterally displacing the suspended scaffold to a protection work installation position by the loading and carrying devices.SELECTED DRAWING: Figure 6
【課題】防護工設置部分の直下に地組後の吊り足場を過渡的に配置し又は仮置きすることが困難な工事環境において好適に採用し得る盛替え式の吊り足場及びその架設方法を提供する。【解決手段】揚重機(11)の牽引力によって吊り足場(1)を高所作業レベルに上昇させた後、揚重機の索条(7)を荷役・運搬装置(12)の懸吊部材(14)に盛替える第1の盛替工程と、荷役・運搬装置によって吊り足場を防護工設置位置に水平移動又は横移動させた後、荷役・運搬装置の懸吊部材を足場板支持用の懸吊部材(8)に盛替える第2の盛替工程とが実施される。【選択図】図6
Suspended scaffold aids erection of san jacinto memorial
Engineering Index Backfile | 1938
|Suspended scaffold aids erection of san jacinto memorial
Engineering Index Backfile | 1938
|Novel full scaffold erection vertical rod and full scaffold erection method based on same
European Patent Office | 2020
|SUSPENDED SCAFFOLDING, ERECTION METHOD FOR SUSPENDED SCAFFOLDING, AND HANGER
European Patent Office | 2017
|