A platform for research: civil engineering, architecture and urbanism
PILE CONSTRUCTION MANAGEMENT SYSTEM AND PORTABLE TERMINAL CONSTITUTING PILE CONSTRUCTION MANAGEMENT SYSTEM
To provide a pile construction management system and a portable terminal, capable of performing construction management on a steel pipe pile while accurately identifying a pile core position of the steel pipe pile in the vicinity of the ground without including any complicated jigs.SOLUTION: A pile construction management system 500 includes: an annular rail member 70 disposed on either of a bracing member 50 or the ground around a steel pipe pile P; a target 100 that travels along the rail member 70; a measuring instrument 200 for measuring at least different two positions of the target 100; and a portable terminal 300 held by an operator of a base machine 10 or a construction manager. The portable terminal 300 comprises: a reception unit 320 for receiving measurement data on the different two positions of the target 100 transmitted from the measuring instrument 200; and a calculation unit 330 for reading the measurement data on the different two positions of the target 100 from the reception unit 320 to calculate a pile core position of the steel pipe pile.SELECTED DRAWING: Figure 1
【課題】複雑な治具を有することなく、地盤の近傍において鋼管杭の杭芯位置を精度よく特定しながら鋼管杭の施工管理を行うことのできる、杭の施工管理システムと携帯端末を提供すること。【解決手段】杭の施工管理システム500であり、振れ止め部材50の上、もしくは鋼管杭Pの周囲の地盤の上のいずれか一方に配設されている環状のレール部材70と、レール部材70に沿って走行するターゲット100と、ターゲット100の少なくとも異なる二つの位置を計測する計測器200と、ベースマシン10のオペレータもしくは施工管理者の有する携帯端末300と、を有し、携帯端末300は、計測器200から送信されるターゲット100の異なる二つの位置に関する計測データを受信する受信部320と、受信部320からターゲット100の異なる二つの位置に関する計測データを読み出し、鋼管杭の杭芯位置を演算する演算部330とを備えている。【選択図】図1
PILE CONSTRUCTION MANAGEMENT SYSTEM AND PORTABLE TERMINAL CONSTITUTING PILE CONSTRUCTION MANAGEMENT SYSTEM
To provide a pile construction management system and a portable terminal, capable of performing construction management on a steel pipe pile while accurately identifying a pile core position of the steel pipe pile in the vicinity of the ground without including any complicated jigs.SOLUTION: A pile construction management system 500 includes: an annular rail member 70 disposed on either of a bracing member 50 or the ground around a steel pipe pile P; a target 100 that travels along the rail member 70; a measuring instrument 200 for measuring at least different two positions of the target 100; and a portable terminal 300 held by an operator of a base machine 10 or a construction manager. The portable terminal 300 comprises: a reception unit 320 for receiving measurement data on the different two positions of the target 100 transmitted from the measuring instrument 200; and a calculation unit 330 for reading the measurement data on the different two positions of the target 100 from the reception unit 320 to calculate a pile core position of the steel pipe pile.SELECTED DRAWING: Figure 1
【課題】複雑な治具を有することなく、地盤の近傍において鋼管杭の杭芯位置を精度よく特定しながら鋼管杭の施工管理を行うことのできる、杭の施工管理システムと携帯端末を提供すること。【解決手段】杭の施工管理システム500であり、振れ止め部材50の上、もしくは鋼管杭Pの周囲の地盤の上のいずれか一方に配設されている環状のレール部材70と、レール部材70に沿って走行するターゲット100と、ターゲット100の少なくとも異なる二つの位置を計測する計測器200と、ベースマシン10のオペレータもしくは施工管理者の有する携帯端末300と、を有し、携帯端末300は、計測器200から送信されるターゲット100の異なる二つの位置に関する計測データを受信する受信部320と、受信部320からターゲット100の異なる二つの位置に関する計測データを読み出し、鋼管杭の杭芯位置を演算する演算部330とを備えている。【選択図】図1
PILE CONSTRUCTION MANAGEMENT SYSTEM AND PORTABLE TERMINAL CONSTITUTING PILE CONSTRUCTION MANAGEMENT SYSTEM
杭の施工管理システム、及び杭の施工管理システムを構成する携帯端末
NAGAHAMA ATSUKO (author) / TAKAHASHI SHUICHI (author) / ITO NAOKO (author) / YAMAMOTO YOSHINORI (author)
2020-10-01
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|European Patent Office | 2020
|CONNECTION METHOD OF PILE CONSTITUTING MEMBER AND PILE CONSTRUCTION MACHINE
European Patent Office | 2017
|PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM
European Patent Office | 2019
|