PILE CONSTRUCTION MANAGEMENT SYSTEM AND PORTABLE TERMINAL CONSTITUTING PILE CONSTRUCTION MANAGEMENT SYSTEM
To provide a pile construction management system and a portable terminal, capable of performing construction management on a steel pipe pile while accurately identifying a pile core position of the steel pipe pile in the vicinity of the ground without including any complicated jigs.SOLUTION: A pile construction management system 500 includes: two targets 100 fixed on a bracing member 50 or the ground around a steel pipe pile P; a measuring instrument 200 for alternately measuring positions of the two targets 100; and a portable terminal 300 held by an operator of a base machine 10 or a construction manager. The portable terminal 300 comprises: a reception unit 320 for receiving measurement data on the positions of the two target 100 transmitted from the measuring instrument 200; and a calculation unit 330 for reading the measurement data on the positions of the two target from the reception unit 320 to calculate a pile core position of the steel pipe pile.SELECTED DRAWING: Figure 1
【課題】複雑な治具を有することなく、地盤の近傍において鋼管杭の杭芯位置を精度よく特定しながら鋼管杭の施工管理を行うことのできる、杭の施工管理システムと携帯端末を提供すること。【解決手段】杭の施工管理システム500であり、振れ止め部材50の上、もしくは鋼管杭Pの周囲の地盤の上に固定されている二つのターゲット100と、二つのターゲット100の位置を交互に計測する計測器200と、ベースマシン10のオペレータもしくは施工管理者の有する携帯端末300と、を有し、携帯端末300は、計測器200から送信される二つのターゲット100の位置に関する計測データを受信する受信部320と、受信部320から二つのターゲットの位置に関する計測データを読み出し、鋼管杭の杭芯位置を演算する演算部330とを備えている。【選択図】図1
PILE CONSTRUCTION MANAGEMENT SYSTEM AND PORTABLE TERMINAL CONSTITUTING PILE CONSTRUCTION MANAGEMENT SYSTEM
To provide a pile construction management system and a portable terminal, capable of performing construction management on a steel pipe pile while accurately identifying a pile core position of the steel pipe pile in the vicinity of the ground without including any complicated jigs.SOLUTION: A pile construction management system 500 includes: two targets 100 fixed on a bracing member 50 or the ground around a steel pipe pile P; a measuring instrument 200 for alternately measuring positions of the two targets 100; and a portable terminal 300 held by an operator of a base machine 10 or a construction manager. The portable terminal 300 comprises: a reception unit 320 for receiving measurement data on the positions of the two target 100 transmitted from the measuring instrument 200; and a calculation unit 330 for reading the measurement data on the positions of the two target from the reception unit 320 to calculate a pile core position of the steel pipe pile.SELECTED DRAWING: Figure 1
【課題】複雑な治具を有することなく、地盤の近傍において鋼管杭の杭芯位置を精度よく特定しながら鋼管杭の施工管理を行うことのできる、杭の施工管理システムと携帯端末を提供すること。【解決手段】杭の施工管理システム500であり、振れ止め部材50の上、もしくは鋼管杭Pの周囲の地盤の上に固定されている二つのターゲット100と、二つのターゲット100の位置を交互に計測する計測器200と、ベースマシン10のオペレータもしくは施工管理者の有する携帯端末300と、を有し、携帯端末300は、計測器200から送信される二つのターゲット100の位置に関する計測データを受信する受信部320と、受信部320から二つのターゲットの位置に関する計測データを読み出し、鋼管杭の杭芯位置を演算する演算部330とを備えている。【選択図】図1
PILE CONSTRUCTION MANAGEMENT SYSTEM AND PORTABLE TERMINAL CONSTITUTING PILE CONSTRUCTION MANAGEMENT SYSTEM
杭の施工管理システム、及び杭の施工管理システムを構成する携帯端末
NAGAHAMA ATSUKO (author) / TAKAHASHI SHUICHI (author) / YAMAMOTO YOSHINORI (author) / PARK JAE-HONG (author)
2020-10-01
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2020
|European Patent Office | 2020
|CONNECTION METHOD OF PILE CONSTITUTING MEMBER AND PILE CONSTRUCTION MACHINE
European Patent Office | 2017
|PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM
European Patent Office | 2019
|