A platform for research: civil engineering, architecture and urbanism
To easily perform installation work.SOLUTION: A method of installing a fence is a method of installing a rectangular plate-shaped precast concrete panel 16 as a fence, and includes: a strut burying step S11 of burying a plurality of cylindrical struts 13 in a ground GR with a space therebetween so that an upper end is positioned at a height which becomes an installation surface IS of the precast concrete panel 16; a panel arranging step S12 of arranging the precast concrete panel 16 having a plurality of through holes 161 vertically penetrating with a space therebetween in the lateral direction on the installation surface IS after the strut burying step S11 so that lower ends of the plurality of through holes 161 face the upper ends of the plurality of struts 13; and a panel fixing step S13 of fixing the precast concrete panel 16 in a skewered manner by a plurality of cylindrical core materials 17 by sequentially inserting the plurality of cylindrical core materials 17 into the through holes 161 and then inserting them into the struts 13 after the panel arranging step S12.SELECTED DRAWING: Figure 3
【課題】簡単に設置作業を行う。【解決手段】塀の設置方法は、矩形平板状のプレキャストコンクリートパネル16を塀として設置する方法であって、プレキャストコンクリートパネル16の設置面ISとなる高さに上端が位置するように、円筒状の複数の支柱13を互いに間隔を空けて地盤GRに埋設する支柱埋設工程S11と、この支柱埋設工程S11の後に、互いに横方向に間隔を空けて上下に貫通している複数の貫通孔161を有しているプレキャストコンクリートパネル16を、複数の貫通孔161の各々の下端が複数の支柱13の上端に対面するように設置面ISに配置するパネル配置工程S12と、このパネル配置工程S12の後に、円筒状の複数の芯材17を順次、貫通孔161に挿入してから支柱13に挿入することで、複数の芯材17でプレキャストコンクリートパネル16を串刺し様に固定するパネル固定工程S13と、を備えている。【選択図】図3
To easily perform installation work.SOLUTION: A method of installing a fence is a method of installing a rectangular plate-shaped precast concrete panel 16 as a fence, and includes: a strut burying step S11 of burying a plurality of cylindrical struts 13 in a ground GR with a space therebetween so that an upper end is positioned at a height which becomes an installation surface IS of the precast concrete panel 16; a panel arranging step S12 of arranging the precast concrete panel 16 having a plurality of through holes 161 vertically penetrating with a space therebetween in the lateral direction on the installation surface IS after the strut burying step S11 so that lower ends of the plurality of through holes 161 face the upper ends of the plurality of struts 13; and a panel fixing step S13 of fixing the precast concrete panel 16 in a skewered manner by a plurality of cylindrical core materials 17 by sequentially inserting the plurality of cylindrical core materials 17 into the through holes 161 and then inserting them into the struts 13 after the panel arranging step S12.SELECTED DRAWING: Figure 3
【課題】簡単に設置作業を行う。【解決手段】塀の設置方法は、矩形平板状のプレキャストコンクリートパネル16を塀として設置する方法であって、プレキャストコンクリートパネル16の設置面ISとなる高さに上端が位置するように、円筒状の複数の支柱13を互いに間隔を空けて地盤GRに埋設する支柱埋設工程S11と、この支柱埋設工程S11の後に、互いに横方向に間隔を空けて上下に貫通している複数の貫通孔161を有しているプレキャストコンクリートパネル16を、複数の貫通孔161の各々の下端が複数の支柱13の上端に対面するように設置面ISに配置するパネル配置工程S12と、このパネル配置工程S12の後に、円筒状の複数の芯材17を順次、貫通孔161に挿入してから支柱13に挿入することで、複数の芯材17でプレキャストコンクリートパネル16を串刺し様に固定するパネル固定工程S13と、を備えている。【選択図】図3
METHOD OF INSTALLING FENCE
塀の設置方法
SATO KATSUHIKO (author)
2020-10-08
Patent
Electronic Resource
Japanese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES