A platform for research: civil engineering, architecture and urbanism
METHOD FOR INSTALLING GUARD FENCE
To reduce construction cost for installing a guard fence.SOLUTION: A method of constructing a guard fence 1 comprises the steps of: constructing a support structure 10 on a base ground G at a predetermined interval, and attaching a guard net 30 to the support structure 10. The step of constructing the support structure 10 comprises the stages of: embedding a base steel pipe 11 with both ends opened in the base ground G; installing a support steel pipe 15 with both ends opened inside the base steel pipe 11; filling mortar M into a clearance S between the base steel pipe 11 and the support steel pipe 15; and filling the mortar M into the support steel pipe 15 from an opening 15b on the upper-end side of the support steel pipe 15. The support steel pipe 15 has a through hole 15c at a position exposed to the ground side in a state of being installed in the base ground G inside the base steel pipe 11, and is filled with the mortar M until the mortar M flows out from the through hole 15c in the second filling step.SELECTED DRAWING: Figure 2
【課題】防護柵を設置に係る施工費用を抑制する。【解決手段】防護柵1を構築する方法は、基礎地盤Gに所定の間隔をあけて支柱構造10を構築する工程と、支柱構造10に防護網30を取り付ける工程と、を備える。支柱構造10を構築する工程は、両端が開口した基礎鋼管11を基礎地盤Gに埋め込む工程と、両端が開口した支柱鋼管15を基礎鋼管11の内側に設置する工程と、基礎鋼管11と支柱鋼管15との間の隙間SにモルタルMを充填する工程と、支柱鋼管15の上端側の開口15bからモルタルMを該支柱鋼管15内に充填する工程と、を含む。支柱鋼管15は、基礎鋼管11の内側の基礎地盤Gに設置された状態において、地上側に露出した位置に貫通孔15cを有し、第2充填工程において、モルタルMが貫通孔15cから流出するまでモルタルMを充填する。【選択図】図2
METHOD FOR INSTALLING GUARD FENCE
To reduce construction cost for installing a guard fence.SOLUTION: A method of constructing a guard fence 1 comprises the steps of: constructing a support structure 10 on a base ground G at a predetermined interval, and attaching a guard net 30 to the support structure 10. The step of constructing the support structure 10 comprises the stages of: embedding a base steel pipe 11 with both ends opened in the base ground G; installing a support steel pipe 15 with both ends opened inside the base steel pipe 11; filling mortar M into a clearance S between the base steel pipe 11 and the support steel pipe 15; and filling the mortar M into the support steel pipe 15 from an opening 15b on the upper-end side of the support steel pipe 15. The support steel pipe 15 has a through hole 15c at a position exposed to the ground side in a state of being installed in the base ground G inside the base steel pipe 11, and is filled with the mortar M until the mortar M flows out from the through hole 15c in the second filling step.SELECTED DRAWING: Figure 2
【課題】防護柵を設置に係る施工費用を抑制する。【解決手段】防護柵1を構築する方法は、基礎地盤Gに所定の間隔をあけて支柱構造10を構築する工程と、支柱構造10に防護網30を取り付ける工程と、を備える。支柱構造10を構築する工程は、両端が開口した基礎鋼管11を基礎地盤Gに埋め込む工程と、両端が開口した支柱鋼管15を基礎鋼管11の内側に設置する工程と、基礎鋼管11と支柱鋼管15との間の隙間SにモルタルMを充填する工程と、支柱鋼管15の上端側の開口15bからモルタルMを該支柱鋼管15内に充填する工程と、を含む。支柱鋼管15は、基礎鋼管11の内側の基礎地盤Gに設置された状態において、地上側に露出した位置に貫通孔15cを有し、第2充填工程において、モルタルMが貫通孔15cから流出するまでモルタルMを充填する。【選択図】図2
METHOD FOR INSTALLING GUARD FENCE
防護柵を設置する方法
NOZAKI YUSUKE (author) / TANAKA JUNICHI (author) / NISHIJIMA TAKEYOSHI (author)
2024-08-02
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
HORIZONTAL MEMBER INSTALLING METAL FITTING FOR GUARD FENCE
European Patent Office | 2017
|HORIZONTAL MEMBER INSTALLING METAL FITTING FOR GUARD FENCE
European Patent Office | 2017
|European Patent Office | 2020
|