To provide a method for repairing steel pipe piles that can obtain sufficient strength by cutting the damaged section of an existing steel pipe pile, attaching a new steel pipe pile with the same diameter as that of the existing steel pipe pile by means of welding, and filling the inside of the steel pipe piles with a filler.SOLUTION: The method for repairing steel pipe piles includes the steps of: cutting a repair target section 9 of a steel pipe pile 1 that is installed in a water bottom ground; welding a new steel pipe pile 10 with the same diameter as that of the steel pipe pile 1 on the cut steel pipe pile 1 in a circumferential direction; draining water from inside of the steel pipe pile 1; and filling, with a filler, a filling space 21 between the steel pipe pile 1 and a small diameter pipe 11 fixed in the new steel pipe pile 10. The small diameter pipe 11 has at or around its lower end, a sealing section 14 that is provided so as to contact an inner peripheral surface of the steel pipe pile 1. The sealing section 14 divides an inside of the new steel pipe pile 10 and the steel pipe pile 1 into upper and lower sections and receives the filler.SELECTED DRAWING: Figure 3
【課題】既設の鋼管杭の損傷部分を切断し、径が同サイズの鋼管杭を溶接により新たに取り付けて内部に充填材を充填することで、充分な強度を得ることができる鋼管杭の補修方法を提供する。【解決手段】水底地盤に打設された鋼管杭1の補修対象部分9を切断する工程と、切断後の鋼管杭1に鋼管杭1と径サイズが同一である新規の鋼管杭10を円周方向に溶接する工程と、鋼管杭1の内部を排水する工程と、鋼管杭1および新規の鋼管杭10内に固定された小径管11との間の充填空間21に充填材を充填する工程と、を含み、小径管11は、下端または下端の近傍において鋼管杭1の内周面に接するように設けられた止水部14を有し、新規の鋼管杭10および鋼管杭1の内部で止水部14が上下を仕切りかつ充填材を受け止める。【選択図】図3
To provide a method for repairing steel pipe piles that can obtain sufficient strength by cutting the damaged section of an existing steel pipe pile, attaching a new steel pipe pile with the same diameter as that of the existing steel pipe pile by means of welding, and filling the inside of the steel pipe piles with a filler.SOLUTION: The method for repairing steel pipe piles includes the steps of: cutting a repair target section 9 of a steel pipe pile 1 that is installed in a water bottom ground; welding a new steel pipe pile 10 with the same diameter as that of the steel pipe pile 1 on the cut steel pipe pile 1 in a circumferential direction; draining water from inside of the steel pipe pile 1; and filling, with a filler, a filling space 21 between the steel pipe pile 1 and a small diameter pipe 11 fixed in the new steel pipe pile 10. The small diameter pipe 11 has at or around its lower end, a sealing section 14 that is provided so as to contact an inner peripheral surface of the steel pipe pile 1. The sealing section 14 divides an inside of the new steel pipe pile 10 and the steel pipe pile 1 into upper and lower sections and receives the filler.SELECTED DRAWING: Figure 3
【課題】既設の鋼管杭の損傷部分を切断し、径が同サイズの鋼管杭を溶接により新たに取り付けて内部に充填材を充填することで、充分な強度を得ることができる鋼管杭の補修方法を提供する。【解決手段】水底地盤に打設された鋼管杭1の補修対象部分9を切断する工程と、切断後の鋼管杭1に鋼管杭1と径サイズが同一である新規の鋼管杭10を円周方向に溶接する工程と、鋼管杭1の内部を排水する工程と、鋼管杭1および新規の鋼管杭10内に固定された小径管11との間の充填空間21に充填材を充填する工程と、を含み、小径管11は、下端または下端の近傍において鋼管杭1の内周面に接するように設けられた止水部14を有し、新規の鋼管杭10および鋼管杭1の内部で止水部14が上下を仕切りかつ充填材を受け止める。【選択図】図3
METHOD FOR REPAIRING STEEL PIPE PILE
鋼管杭の補修方法
HARA MOTOHISA (author)
2020-10-22
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE PILE CONSTRUCTION METHOD FOR REPAIRING FOUNDATION
European Patent Office | 2019
|Pile sinking head damage repairing method of PHC pipe pile
European Patent Office | 2016
|STEEL PIPE PILE DEVICE, STEEL PIPE PILE AND METHOD FOR INSTALLING STEEL PIPE PILE
European Patent Office | 2018
|Strengthening and repairing construction method for offshore wind power steel pipe pile
European Patent Office | 2022
|STEEL PIPE PILE JOINT, STEEL PIPE PILE, AND CONSTRUCTION METHOD OF STEEL PIPE PILE
European Patent Office | 2021
|