A platform for research: civil engineering, architecture and urbanism
COUPLER OF PC STEEL INTRODUCING PRESTRESS IN PRETENSION METHOD
To provide a pretension method causing no lowering of productivity and yield deterioration of an excessive length part, when introducing prestress into a concrete member.SOLUTION: A coupler 10 connecting PC steel materials with each other includes a first connection part 100 for connecting a first PC steel 30 being an excessive length part, a second connection part 200 for connecting a second PC steel 20 being a manufacturing section, and an adjusting part 300 with one end along the axial direction of the PC steel connected to the first connection part 100, the other end along the axial direction of the PC steel connected to the second connection part 200, for adjusting the length along the axial direction from the first connection part 100 to the second connection part 200. The adjusting part 300 includes a hollow PC steel bar 340 and a solid PC steel bar 330 changing the axial length by changing the insertion length into the hollow PC steel bar 340.SELECTED DRAWING: Figure 2
【課題】プレテンション方式においてコンクリート部材にプレストレスを導入する場合に、生産性を低下させず余長部の歩留りを悪化させない。【解決手段】PC鋼材どうしを接続する接続具10は、余長部である第1のPC鋼材30が接続される第1の接続部100と、製造部である第2のPC鋼材20が接続される第2の接続部200と、PC鋼材の軸方向に沿った一端が第1の接続部100に接続され、PC鋼材の軸方向に沿った他端が第2の接続部200に接続され、第1の接続部100から第2の接続部200までの軸方向に沿った長さを調整する調整部300とを含む。調整部300は、中空PC鋼棒340とこの中空PC鋼棒340に挿入される長さを変更することにより軸方向の長さが変更される中実PC鋼棒330とを含む。【選択図】図2
COUPLER OF PC STEEL INTRODUCING PRESTRESS IN PRETENSION METHOD
To provide a pretension method causing no lowering of productivity and yield deterioration of an excessive length part, when introducing prestress into a concrete member.SOLUTION: A coupler 10 connecting PC steel materials with each other includes a first connection part 100 for connecting a first PC steel 30 being an excessive length part, a second connection part 200 for connecting a second PC steel 20 being a manufacturing section, and an adjusting part 300 with one end along the axial direction of the PC steel connected to the first connection part 100, the other end along the axial direction of the PC steel connected to the second connection part 200, for adjusting the length along the axial direction from the first connection part 100 to the second connection part 200. The adjusting part 300 includes a hollow PC steel bar 340 and a solid PC steel bar 330 changing the axial length by changing the insertion length into the hollow PC steel bar 340.SELECTED DRAWING: Figure 2
【課題】プレテンション方式においてコンクリート部材にプレストレスを導入する場合に、生産性を低下させず余長部の歩留りを悪化させない。【解決手段】PC鋼材どうしを接続する接続具10は、余長部である第1のPC鋼材30が接続される第1の接続部100と、製造部である第2のPC鋼材20が接続される第2の接続部200と、PC鋼材の軸方向に沿った一端が第1の接続部100に接続され、PC鋼材の軸方向に沿った他端が第2の接続部200に接続され、第1の接続部100から第2の接続部200までの軸方向に沿った長さを調整する調整部300とを含む。調整部300は、中空PC鋼棒340とこの中空PC鋼棒340に挿入される長さを変更することにより軸方向の長さが変更される中実PC鋼棒330とを含む。【選択図】図2
COUPLER OF PC STEEL INTRODUCING PRESTRESS IN PRETENSION METHOD
プレテンション方式においてプレストレスを導入するPC鋼材の接続具
NODA KAZUNARI (author) / MATSUDAIRA TAKUTO (author) / HIRAO MINAMI (author) / MATSUSHITA AKIRA (author) / ONISHI MUTSUHIKO (author)
2020-10-29
Patent
Electronic Resource
Japanese
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E01D
BRIDGES
,
Brücken
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2017
|British Library Conference Proceedings | 2008
|