SAND MATERIAL SUPPLY METHOD FOR SAND PILE CREATION METHOD
To provide a sand material supply method for a sand pile creation method which can scoop up and load an appropriate amount of sand material, when scooping up and loading the sand material in a material transportation vehicle, and supply an accurate amount of the sand material to a ground improvement construction machine.SOLUTION: A sand material supply method for a sand pile creation method comprises: a first step P1 of calculating, by an arithmetic processing unit, a supply amount of the sand material per one time supplied to a ground improvement construction machine; a second step P2 of transmitting, to a material transportation vehicle, information on the supply amount of the sand material per one time supplied to the ground improvement construction machine; a third step P3 of providing notification of the information on the supply amount of the sand material per one time supplied to the ground improvement construction machine by a notifying unit of the material transportation vehicle; a fourth step P4 of, in the material transportation vehicle, loading the sand material of the supply amount per one time supplied to the ground improvement construction machine, notified by the notifying unit; and a fifth step P5 of transporting the sand material by the material transportation vehicle and supplying the same to the ground improvement construction machine.SELECTED DRAWING: Figure 4
【課題】材料運搬車両において砂材料をすくい上げて積み込む際に、適切な量の砂材料をすくい上げて積み込むことができ、地盤改良施工機に正確な量の砂材料を供給することができる砂杭造成工法の砂材料供給方法を提供する。【解決手段】砂杭造成工法の砂材料供給方法は、演算処理部で地盤改良施工機に供給する1回当たりの砂材料の供給量を算出する第1の工程P1と、地盤改良施工機に供給する1回当たりの砂材料の供給量の情報を材料運搬車両に送信する第2の工程P2と、材料運搬車両の通知部で地盤改良施工機に供給する1回当たりの砂材料の供給量の情報を通知する第3の工程P3と、材料運搬車両において、通知部で通知された地盤改良施工機に供給する1回当たりの砂材料の供給量となる砂材料を積み込む第4の工程P4と、砂材料を材料運搬車両で運搬して地盤改良施工機に供給する第5の工程P5を有する。【選択図】図4
SAND MATERIAL SUPPLY METHOD FOR SAND PILE CREATION METHOD
To provide a sand material supply method for a sand pile creation method which can scoop up and load an appropriate amount of sand material, when scooping up and loading the sand material in a material transportation vehicle, and supply an accurate amount of the sand material to a ground improvement construction machine.SOLUTION: A sand material supply method for a sand pile creation method comprises: a first step P1 of calculating, by an arithmetic processing unit, a supply amount of the sand material per one time supplied to a ground improvement construction machine; a second step P2 of transmitting, to a material transportation vehicle, information on the supply amount of the sand material per one time supplied to the ground improvement construction machine; a third step P3 of providing notification of the information on the supply amount of the sand material per one time supplied to the ground improvement construction machine by a notifying unit of the material transportation vehicle; a fourth step P4 of, in the material transportation vehicle, loading the sand material of the supply amount per one time supplied to the ground improvement construction machine, notified by the notifying unit; and a fifth step P5 of transporting the sand material by the material transportation vehicle and supplying the same to the ground improvement construction machine.SELECTED DRAWING: Figure 4
【課題】材料運搬車両において砂材料をすくい上げて積み込む際に、適切な量の砂材料をすくい上げて積み込むことができ、地盤改良施工機に正確な量の砂材料を供給することができる砂杭造成工法の砂材料供給方法を提供する。【解決手段】砂杭造成工法の砂材料供給方法は、演算処理部で地盤改良施工機に供給する1回当たりの砂材料の供給量を算出する第1の工程P1と、地盤改良施工機に供給する1回当たりの砂材料の供給量の情報を材料運搬車両に送信する第2の工程P2と、材料運搬車両の通知部で地盤改良施工機に供給する1回当たりの砂材料の供給量の情報を通知する第3の工程P3と、材料運搬車両において、通知部で通知された地盤改良施工機に供給する1回当たりの砂材料の供給量となる砂材料を積み込む第4の工程P4と、砂材料を材料運搬車両で運搬して地盤改良施工機に供給する第5の工程P5を有する。【選択図】図4
SAND MATERIAL SUPPLY METHOD FOR SAND PILE CREATION METHOD
砂杭造成工法の砂材料供給方法
YAMASHITA YUJI (author) / HIROHATA NORIFUMI (author) / SUZUKI AKIHIKO (author) / IMAKIRE KENICHI (author)
2020-12-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SAND COMPACTION PILE MATERIAL, SAND COMPACTION PILE AND SAND COMPACTION PILE DEVELOPING METHOD
European Patent Office | 2016
|European Patent Office | 2015
|European Patent Office | 2018
|