A platform for research: civil engineering, architecture and urbanism
POSITION CONFIRMATION CORRESPONDING STRUCTURE OF CONCRETE SIDE BLOCK JOINT PART IN DIVIDED MANHOLE, AND CONFIRMATION METHOD
To provide a position confirmation corresponding structure of a concrete side block joint part allowing easy confirmation of the position of the stacked concrete side block joint part in a divided manhole after rehabilitation, and a confirmation method.SOLUTION: The position confirmation corresponding structure of a concrete side block joint part is formed by arranging metallic markers 4 to joint parts 3 of a stacked concrete side block 2 in a divided manhole. The position of the joint part 3 of the stacked concrete side block 2 in the divided manhole 1 formed in a rehabilitation structure by covering an inner peripheral face with a reinforcement layer 7, can be confirmed by detecting the metallic markers 4 by using a metal detector 8.SELECTED DRAWING: Figure 5
【課題】 更生後の分割人孔における積層されたコンクリート側塊の接合部の位置を容易に確認できるようにしたコンクリート側塊接合部の位置確認対応構造および確認方法を得る。【解決手段】 分割人孔1における積層されたコンクリート側塊2の接合部3に、金属製マーカー4を配置してコンクリート側塊接合部の位置確認対応構造とし、内周面を補強層7で覆い更生構造とした分割人孔1における積層されたコンクリート側塊2の接合部3を、金属探知器8を使用することにより金属製マーカー4を探知し、これにより積層されたコンクリート側塊2の接合部3の位置を確認することができるようにした。【選択図】図5
POSITION CONFIRMATION CORRESPONDING STRUCTURE OF CONCRETE SIDE BLOCK JOINT PART IN DIVIDED MANHOLE, AND CONFIRMATION METHOD
To provide a position confirmation corresponding structure of a concrete side block joint part allowing easy confirmation of the position of the stacked concrete side block joint part in a divided manhole after rehabilitation, and a confirmation method.SOLUTION: The position confirmation corresponding structure of a concrete side block joint part is formed by arranging metallic markers 4 to joint parts 3 of a stacked concrete side block 2 in a divided manhole. The position of the joint part 3 of the stacked concrete side block 2 in the divided manhole 1 formed in a rehabilitation structure by covering an inner peripheral face with a reinforcement layer 7, can be confirmed by detecting the metallic markers 4 by using a metal detector 8.SELECTED DRAWING: Figure 5
【課題】 更生後の分割人孔における積層されたコンクリート側塊の接合部の位置を容易に確認できるようにしたコンクリート側塊接合部の位置確認対応構造および確認方法を得る。【解決手段】 分割人孔1における積層されたコンクリート側塊2の接合部3に、金属製マーカー4を配置してコンクリート側塊接合部の位置確認対応構造とし、内周面を補強層7で覆い更生構造とした分割人孔1における積層されたコンクリート側塊2の接合部3を、金属探知器8を使用することにより金属製マーカー4を探知し、これにより積層されたコンクリート側塊2の接合部3の位置を確認することができるようにした。【選択図】図5
POSITION CONFIRMATION CORRESPONDING STRUCTURE OF CONCRETE SIDE BLOCK JOINT PART IN DIVIDED MANHOLE, AND CONFIRMATION METHOD
分割人孔におけるコンクリート側塊接合部の位置確認対応構造および確認方法
IMAZAKI YUJI (author)
2021-02-12
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SYSTEM FOR DETECTING FLOOD OF MANHOLE AND FLOOD CONFIRMATION APPARATUS
European Patent Office | 2018
|CONCRETE TOP END CONFIRMATION METHOD, AND CONCRETE TOP END CONFIRMATION DEVICE
European Patent Office | 2024
|European Patent Office | 2019
|European Patent Office | 2018
|