UNDERGROUND PIPE PROTECTION BODY AND UNDERGROUND PIPE PROTECTION METHOD
To provide an underground pipe protection body that can suppress abrupt increase of a load applied to an underground pipe and suppress subsidence by being installed on an upper surface side of the underground pipe embedded under the ground, and provide an underground pipe protection method.SOLUTION: An underground pipe protection body 1 is arranged above an underground pipe 2, and comprises: a plate-shaped concrete skeleton 3 installed horizontally; a plurality of columnar piles 4 arranged while sandwiching the underground pipe 2 facing in a vertical direction; and a plate-shaped buffer 5 sandwiched between the plurality of piles 4 and arranged horizontally between a lower surface 3a of the concrete skeleton 3 and the underground pipe 2. Further, an upper end 4a of the pile 4 is joined to and integrated with the lower surface 3a of the concrete skeleton 3.SELECTED DRAWING: Figure 1
【課題】地中に埋設される埋設管の上面側に設置することにより、埋設管が受ける荷重の急激な増加を抑制し、かつ沈下を抑制することができる埋設管防護体及び埋設管防護工法を提供することにある。【解決手段】埋設管防護体1は埋設管2の上方に配置され、水平に設置された板状のコンクリート躯体3と、鉛直方向を向いた埋設管2を挟みながら配置された複数の円柱状の杭4と、この複数の杭4の間に挟まれ、かつコンクリート躯体3の下面3aと埋設管2の間に水平に置かれた板状の緩衝体5とからなる。さらに、杭4の上端4aはコンクリート躯体3の下面3aに接合され、一体化されている。【選択図】図1
UNDERGROUND PIPE PROTECTION BODY AND UNDERGROUND PIPE PROTECTION METHOD
To provide an underground pipe protection body that can suppress abrupt increase of a load applied to an underground pipe and suppress subsidence by being installed on an upper surface side of the underground pipe embedded under the ground, and provide an underground pipe protection method.SOLUTION: An underground pipe protection body 1 is arranged above an underground pipe 2, and comprises: a plate-shaped concrete skeleton 3 installed horizontally; a plurality of columnar piles 4 arranged while sandwiching the underground pipe 2 facing in a vertical direction; and a plate-shaped buffer 5 sandwiched between the plurality of piles 4 and arranged horizontally between a lower surface 3a of the concrete skeleton 3 and the underground pipe 2. Further, an upper end 4a of the pile 4 is joined to and integrated with the lower surface 3a of the concrete skeleton 3.SELECTED DRAWING: Figure 1
【課題】地中に埋設される埋設管の上面側に設置することにより、埋設管が受ける荷重の急激な増加を抑制し、かつ沈下を抑制することができる埋設管防護体及び埋設管防護工法を提供することにある。【解決手段】埋設管防護体1は埋設管2の上方に配置され、水平に設置された板状のコンクリート躯体3と、鉛直方向を向いた埋設管2を挟みながら配置された複数の円柱状の杭4と、この複数の杭4の間に挟まれ、かつコンクリート躯体3の下面3aと埋設管2の間に水平に置かれた板状の緩衝体5とからなる。さらに、杭4の上端4aはコンクリート躯体3の下面3aに接合され、一体化されている。【選択図】図1
UNDERGROUND PIPE PROTECTION BODY AND UNDERGROUND PIPE PROTECTION METHOD
埋設管防護体及び埋設管防護工法
SAITO SUNAO (author) / YASUNO KOSEI (author) / TAMAI TAKANORI (author)
2021-02-12
Patent
Electronic Resource
Japanese
IPC:
F16L
PIPES
,
Rohre
/
E02D
FOUNDATIONS
,
Gründungen
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
UNDERGROUND PIPE PROTECTION METHOD AND PROTECTION STRUCTURE
European Patent Office | 2019
|PROTECTION STRUCTURE AND PROTECTION METHOD OF UNDERGROUND PIPE
European Patent Office | 2017
|