A platform for research: civil engineering, architecture and urbanism
FIXING STRUCTURE FOR FLOOR HEAT INSULATING MATERIAL AND FIXING METHOD FOR FLOOR HEAT INSULATING MATERIAL
To provide a fixing structure for a floor heat insulating material and a fixing method for a floor heat insulating material which ensure uniform quality at the time of construction and have high versatility.SOLUTION: In a floor small beam 28 formed in an open cross-sectional shape, a first receiving member 36 is fixed to an upper flange part 28B. The first receiving member 36 supports a first heat insulating material 34 with a first support part 36B extending in a direction separated from a web part 28A of the floor small beam 28. A second receiving member 46 is fixed to the first receiving member 36 through a second fixing part 50. The second receiving member 46 supports a second heat insulating material 40 laid on the lower side of the first heat insulating material 34 with a second wall part 44B extending in a direction separated from the web part 28A. A third receiving member 48 is fixed to the second receiving member 46 through a third fixing part 54. The third receiving member 48 supports a third heat insulating material 42 arranged inside an open cross section of the floor small beam 28 on one end of the first wall part 44A extending in a direction approaching the web part 28A.SELECTED DRAWING: Figure 3
【課題】施工時の品質の均一化を図り、汎用性の高い床断熱材の固定構造及び床断熱材の固定方法を提供する。【解決手段】開断面状に形成された床小梁28では、上フランジ部28Bに第1受部材36が固定されている。この第1受部材36は、床小梁28のウエブ部28Aと離間する方向へ延在する第1支持部36Bで第1断熱材34を支持している。また、第1受部材36には、第2固定部50を介して第2受部材46が固定されている。この第2受部材46は、ウエブ部28Aと離間する方向へ延在する第2壁部44Bで第1断熱材34の下方側に敷設された第2断熱材40を支持している。さらに、第2受部材46には、第3固定部54を介して第3受部材48が固定されている。この第3受部材48は、ウエブ部28Aに接近する方向へ延在する第1壁部44Aの一端で床小梁28の開断面の内部に配置された第3断熱材42を支持している。【選択図】図3
FIXING STRUCTURE FOR FLOOR HEAT INSULATING MATERIAL AND FIXING METHOD FOR FLOOR HEAT INSULATING MATERIAL
To provide a fixing structure for a floor heat insulating material and a fixing method for a floor heat insulating material which ensure uniform quality at the time of construction and have high versatility.SOLUTION: In a floor small beam 28 formed in an open cross-sectional shape, a first receiving member 36 is fixed to an upper flange part 28B. The first receiving member 36 supports a first heat insulating material 34 with a first support part 36B extending in a direction separated from a web part 28A of the floor small beam 28. A second receiving member 46 is fixed to the first receiving member 36 through a second fixing part 50. The second receiving member 46 supports a second heat insulating material 40 laid on the lower side of the first heat insulating material 34 with a second wall part 44B extending in a direction separated from the web part 28A. A third receiving member 48 is fixed to the second receiving member 46 through a third fixing part 54. The third receiving member 48 supports a third heat insulating material 42 arranged inside an open cross section of the floor small beam 28 on one end of the first wall part 44A extending in a direction approaching the web part 28A.SELECTED DRAWING: Figure 3
【課題】施工時の品質の均一化を図り、汎用性の高い床断熱材の固定構造及び床断熱材の固定方法を提供する。【解決手段】開断面状に形成された床小梁28では、上フランジ部28Bに第1受部材36が固定されている。この第1受部材36は、床小梁28のウエブ部28Aと離間する方向へ延在する第1支持部36Bで第1断熱材34を支持している。また、第1受部材36には、第2固定部50を介して第2受部材46が固定されている。この第2受部材46は、ウエブ部28Aと離間する方向へ延在する第2壁部44Bで第1断熱材34の下方側に敷設された第2断熱材40を支持している。さらに、第2受部材46には、第3固定部54を介して第3受部材48が固定されている。この第3受部材48は、ウエブ部28Aに接近する方向へ延在する第1壁部44Aの一端で床小梁28の開断面の内部に配置された第3断熱材42を支持している。【選択図】図3
FIXING STRUCTURE FOR FLOOR HEAT INSULATING MATERIAL AND FIXING METHOD FOR FLOOR HEAT INSULATING MATERIAL
床断熱材の固定構造及び床断熱材の固定方法
HORI MASARU (author)
2021-04-08
Patent
Electronic Resource
Japanese
FLOOR MATERIAL FIXING MEMBER AND FLOOR MATERIAL FIXING METHOD
European Patent Office | 2020
|Fixing apparatus for heat insulating material and finishing material
European Patent Office | 2018
|