A platform for research: civil engineering, architecture and urbanism
PILE SUPPORT STRUCTURE AND CONSTRUCTION METHOD THEREOF
To provide a pile support structure and a construction method thereof allowing all of precast members to be manufactured in a factory and to be installed using a compact size crane or a floating crane.SOLUTION: A prefabricated beam member 9 of a pile support structure 1 is provided with: a top plate part 12; side wall parts 13, 13 suspended from both of side edges of the top plate part 12; and beam member sheathes 14 buried in the side wall parts 13. A joined member 8 joined on a pile column-shaped body 4 is projected from the outside surface and is provided with: a receiving shelf part 26 on which an end part of the top plate part 12 is placed; and joined member sheathes 15 opened at both sides of the receiving shelf part 26. PC members 31 inserted into the connected beam member sheathes 14 and the joined member sheathes 15 are fixed in a tensioned state to join the joined member 8 and the prefabricated beam member 9.SELECTED DRAWING: Figure 3
【課題】全てのプレキャスト部材を工場で製作でき、且つ、小型の起重機又は起重機船を用いて施工可能な杭支持構造物及びその構築方法の提供。【解決手段】この杭支持構造物1は、既製梁部材9が天板部12と、天板部12の両側縁より垂下された側壁部13,13と、側壁部13に埋設された梁部材シース14とを備え、杭柱状体4に接合される接合部材8が外側面より突出し、天板部12の端部が載置される受棚部26と、受棚部26の両側に開口した接合部材シース15とを備え、連通した梁部材シース14と接合部材シース15とに挿通したPC部材31が緊張された状態で定着され、接合部材8と既製梁部材9とが接合されている。【選択図】図3
PILE SUPPORT STRUCTURE AND CONSTRUCTION METHOD THEREOF
To provide a pile support structure and a construction method thereof allowing all of precast members to be manufactured in a factory and to be installed using a compact size crane or a floating crane.SOLUTION: A prefabricated beam member 9 of a pile support structure 1 is provided with: a top plate part 12; side wall parts 13, 13 suspended from both of side edges of the top plate part 12; and beam member sheathes 14 buried in the side wall parts 13. A joined member 8 joined on a pile column-shaped body 4 is projected from the outside surface and is provided with: a receiving shelf part 26 on which an end part of the top plate part 12 is placed; and joined member sheathes 15 opened at both sides of the receiving shelf part 26. PC members 31 inserted into the connected beam member sheathes 14 and the joined member sheathes 15 are fixed in a tensioned state to join the joined member 8 and the prefabricated beam member 9.SELECTED DRAWING: Figure 3
【課題】全てのプレキャスト部材を工場で製作でき、且つ、小型の起重機又は起重機船を用いて施工可能な杭支持構造物及びその構築方法の提供。【解決手段】この杭支持構造物1は、既製梁部材9が天板部12と、天板部12の両側縁より垂下された側壁部13,13と、側壁部13に埋設された梁部材シース14とを備え、杭柱状体4に接合される接合部材8が外側面より突出し、天板部12の端部が載置される受棚部26と、受棚部26の両側に開口した接合部材シース15とを備え、連通した梁部材シース14と接合部材シース15とに挿通したPC部材31が緊張された状態で定着され、接合部材8と既製梁部材9とが接合されている。【選択図】図3
PILE SUPPORT STRUCTURE AND CONSTRUCTION METHOD THEREOF
杭支持構造物及びその構築方法
ISHIZUKA SHINTA (author) / IKENO KATSUYA (author) / KAWABATA YUICHIRO (author) / KATO EMA (author) / IWANAMI MITSUHO (author) / MAE YOSHIAKI (author) / AMAYA KIMIHIKO (author)
2021-05-06
Patent
Electronic Resource
Japanese
PEC structure support pile and construction method thereof
European Patent Office | 2021
|Support pile closed enclosure structure and construction method thereof
European Patent Office | 2020
|Support pile, support pile production method and support pile construction method
European Patent Office | 2023
|Drainage prefabricated support pile wall structure and construction method thereof
European Patent Office | 2023
|