ANCHOR PIPE AND SLOPE FACE REINFORCEMENT METHOD
To provide an anchor pipe that is suitable for being used in a slope face reinforcing construction work for preventing collapse of a slope face much generated in rainfall time, and a slope face reinforcement method performed using the anchor pipe.SOLUTION: An anchor pipe 1 includes a pipe 2 whose both ends are opened, a branch piece 5 formed in a tip side region 6 of the pipe 2, and a stuffing member 4 for expanding the branch pipe 5 in the ground G by being pressed into the tip side region 6 of the pipe 2 from a rear end opening 16 of the pipe 2. The pipe 2 is inserted into a prepared hole 21 formed on a slope face W from the tip side, and a stuffing member 4 is pressed into the pipe 2. Since the stuffing member 4 expands the branch piece 5 in the ground G, the pipe 2 is strongly fixed to the ground G. Therefore, the slope face is reinforced by arranging a slope face pressing member between the pipe and the slope face, and a reinforcement action maintains by draining ground water in the slope face through the pipe 2.SELECTED DRAWING: Figure 1
【課題】降雨時に多く発生する法面崩壊を防止するための法面補強工事に用いて好適なアンカーパイプと、このアンカーパイプを用いて行う法面補強工法を提供する。【解決手段】アンカーパイプ1は、両端が開口したパイプ2と、該パイプ2の先端側領域6に形成される分岐片5と、パイプ2の後端開口部16からパイプ2の先端側領域6内へと圧入されることにより分岐片5を地盤G内で拡開させる詰め込み部材4と、を備える。法面Wに形成された下穴21にパイプ2を先端側から挿入し、パイプ2内へと詰め込み部材4を圧入する。地盤G内で詰め込み部材4が分岐片5を拡開させるので、パイプ2が地盤Gに対して強固に固定される。よって、法面押圧部材をパイプと法面との間に配設することで法面が補強され、パイプ2を通して法面内の地下水を排水させることで補強作用が持続する。【選択図】 図1
ANCHOR PIPE AND SLOPE FACE REINFORCEMENT METHOD
To provide an anchor pipe that is suitable for being used in a slope face reinforcing construction work for preventing collapse of a slope face much generated in rainfall time, and a slope face reinforcement method performed using the anchor pipe.SOLUTION: An anchor pipe 1 includes a pipe 2 whose both ends are opened, a branch piece 5 formed in a tip side region 6 of the pipe 2, and a stuffing member 4 for expanding the branch pipe 5 in the ground G by being pressed into the tip side region 6 of the pipe 2 from a rear end opening 16 of the pipe 2. The pipe 2 is inserted into a prepared hole 21 formed on a slope face W from the tip side, and a stuffing member 4 is pressed into the pipe 2. Since the stuffing member 4 expands the branch piece 5 in the ground G, the pipe 2 is strongly fixed to the ground G. Therefore, the slope face is reinforced by arranging a slope face pressing member between the pipe and the slope face, and a reinforcement action maintains by draining ground water in the slope face through the pipe 2.SELECTED DRAWING: Figure 1
【課題】降雨時に多く発生する法面崩壊を防止するための法面補強工事に用いて好適なアンカーパイプと、このアンカーパイプを用いて行う法面補強工法を提供する。【解決手段】アンカーパイプ1は、両端が開口したパイプ2と、該パイプ2の先端側領域6に形成される分岐片5と、パイプ2の後端開口部16からパイプ2の先端側領域6内へと圧入されることにより分岐片5を地盤G内で拡開させる詰め込み部材4と、を備える。法面Wに形成された下穴21にパイプ2を先端側から挿入し、パイプ2内へと詰め込み部材4を圧入する。地盤G内で詰め込み部材4が分岐片5を拡開させるので、パイプ2が地盤Gに対して強固に固定される。よって、法面押圧部材をパイプと法面との間に配設することで法面が補強され、パイプ2を通して法面内の地下水を排水させることで補強作用が持続する。【選択図】 図1
ANCHOR PIPE AND SLOPE FACE REINFORCEMENT METHOD
アンカーパイプ及び法面補強工法
INADA TAICHI (author) / HIROI KEIJI (author) / TOMITA MITSURU (author)
2021-06-24
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Stamping anchor pipe and method for soil slope reinforcement
European Patent Office | 2024
|SLOPE FACE REINFORCEMENT STRUCTURE AND SLOPE FACE REINFORCEMENT METHOD
European Patent Office | 2017
|Slope Reinforcement Concrete Anchor Block and Slope Reinforcement Construction Method Using Same
European Patent Office | 2019
|