BINDING METAL FITTINGS AND METHOD OF ATTACHING BINDING METAL FITTINGS
To provide binding metal fittings which solve a problem in which conventionally, plural binding metal fittings are generally placed into a container, and the binding metal fittings are transported to a working site together with the container, and then the binding metal fittings are taken out from the container to perform binding work of a single steel pipe, but there is an accident that the binding metal fittings are dropped in a period between when the binding metal fittings are taken out from the container and when the binding metal fittings are assembled.SOLUTION: There is provided a method of attaching binding metal fittings in which plural binding metal fittings 1 are placed into a container 6 and transported to a working site G, the other end of a coupling member 3 to which one end is coupled to a worker side beforehand is engaged with a coupling part 4 of the binding metal fittings 1 in the container 6, only the binding metal fittings 1 which are in a coupling condition by the coupling member 3 are taken out from the container 6, and the binding metal fittings 1 taken out are attached to a single steel pipe 2 fixed to the working site G or a fixing part 5 of the working site G.SELECTED DRAWING: Figure 1
【課題】従来、一般的には容器に複数個の緊結金具を入れ、作業現場まで容器ごと運搬し、容器から緊結金具を取り出して単鋼管の緊結作業を行っており、この容器から取出すときから組付ける間に緊結金具を取り落とすという事故が発生するという課題がある。【解決手段】容器6に複数個の緊結金具1を入れて作業現場Gまで運搬し、一端を予め作業者側に連結した連結用部材3の他端を、容器6内の緊結金具1の連結部4に係止し、連結用部材3で連結状態の緊結金具1のみを容器6から取り出し、取り出した緊結金具1を作業現場Gに固定された単鋼管2または作業現場Gの固定部5に取付ける緊結金具の取付け方法。【選択図】 図1
BINDING METAL FITTINGS AND METHOD OF ATTACHING BINDING METAL FITTINGS
To provide binding metal fittings which solve a problem in which conventionally, plural binding metal fittings are generally placed into a container, and the binding metal fittings are transported to a working site together with the container, and then the binding metal fittings are taken out from the container to perform binding work of a single steel pipe, but there is an accident that the binding metal fittings are dropped in a period between when the binding metal fittings are taken out from the container and when the binding metal fittings are assembled.SOLUTION: There is provided a method of attaching binding metal fittings in which plural binding metal fittings 1 are placed into a container 6 and transported to a working site G, the other end of a coupling member 3 to which one end is coupled to a worker side beforehand is engaged with a coupling part 4 of the binding metal fittings 1 in the container 6, only the binding metal fittings 1 which are in a coupling condition by the coupling member 3 are taken out from the container 6, and the binding metal fittings 1 taken out are attached to a single steel pipe 2 fixed to the working site G or a fixing part 5 of the working site G.SELECTED DRAWING: Figure 1
【課題】従来、一般的には容器に複数個の緊結金具を入れ、作業現場まで容器ごと運搬し、容器から緊結金具を取り出して単鋼管の緊結作業を行っており、この容器から取出すときから組付ける間に緊結金具を取り落とすという事故が発生するという課題がある。【解決手段】容器6に複数個の緊結金具1を入れて作業現場Gまで運搬し、一端を予め作業者側に連結した連結用部材3の他端を、容器6内の緊結金具1の連結部4に係止し、連結用部材3で連結状態の緊結金具1のみを容器6から取り出し、取り出した緊結金具1を作業現場Gに固定された単鋼管2または作業現場Gの固定部5に取付ける緊結金具の取付け方法。【選択図】 図1
BINDING METAL FITTINGS AND METHOD OF ATTACHING BINDING METAL FITTINGS
緊結金具および緊結金具の取付方法
FUNAKI MOTOKI (author)
2021-07-26
Patent
Electronic Resource
Japanese
IPC:
E04G