A platform for research: civil engineering, architecture and urbanism
CONTINUOUS UNDERGROUND WALL AND METHOD FOR CONSTRUCTING CONTINUOUS UNDERGROUND WALL
To provide a continuous underground wall that can be easily constructed and can prevent damage to a joint surface of a preceding element, and a method for constructing the continuous underground wall.SOLUTION: A preceding element 2 (first element) has a first concrete portion 23 and a corrugated steel plate 5 provided over the entire wall height direction along an end portion of the first concrete portion 23 on a trailing element 3 side. In the corrugated steel plate 5, a ridge 526 projecting in a wall length direction in which the preceding element 2 and the trailing element 3 are adjacent to each other and extending in a wall thickness direction and a recess 525 recessed in the wall length direction and extending in the wall thickness direction are alternately arranged in a wall height direction, and the first concrete portion 23 is fixed on the surface on the first concrete portion 23 side. The trailing element 3 (second element) has a second concrete portion 33 that is fixed on the surface of the corrugated steel plate 5 on the trailing element 3 side, and further has a box-shaped protective member 6 temporarily provided so as to contact and cover the corrugated steel plate 5 from the trailing element 3 side.SELECTED DRAWING: Figure 4
【課題】容易に施工することができるとともに、先行エレメントの継手面の損傷を防止できる連続地中壁および連続地中壁の施工方法を提供する。【解決手段】先行エレメント2(第1エレメント)は、第1コンクリート部23と、第1コンクリート部23における後行エレメント3側の端部に沿って、壁高さ方向全体にわたって設けられた波形鋼板5と、を有し、波形鋼板5は、先行エレメント2と後行エレメント3が隣接する壁長さ方向に突出し、壁厚さ方向に延びる凸条部526と、壁長さ方向に凹み、壁厚さ方向に延びる凹条部525と、が壁高さ方向に交互に配列されるとともに第1コンクリート部23側の面に第1コンクリート部23が定着し、後行エレメント3(第2エレメント)は、波形鋼板5の後行エレメント3側の面と定着する第2コンクリート部33を有し、波形鋼板5を後行エレメント3側から接触して覆うように仮設される箱状の保護部材6をさらに有する。【選択図】図4
CONTINUOUS UNDERGROUND WALL AND METHOD FOR CONSTRUCTING CONTINUOUS UNDERGROUND WALL
To provide a continuous underground wall that can be easily constructed and can prevent damage to a joint surface of a preceding element, and a method for constructing the continuous underground wall.SOLUTION: A preceding element 2 (first element) has a first concrete portion 23 and a corrugated steel plate 5 provided over the entire wall height direction along an end portion of the first concrete portion 23 on a trailing element 3 side. In the corrugated steel plate 5, a ridge 526 projecting in a wall length direction in which the preceding element 2 and the trailing element 3 are adjacent to each other and extending in a wall thickness direction and a recess 525 recessed in the wall length direction and extending in the wall thickness direction are alternately arranged in a wall height direction, and the first concrete portion 23 is fixed on the surface on the first concrete portion 23 side. The trailing element 3 (second element) has a second concrete portion 33 that is fixed on the surface of the corrugated steel plate 5 on the trailing element 3 side, and further has a box-shaped protective member 6 temporarily provided so as to contact and cover the corrugated steel plate 5 from the trailing element 3 side.SELECTED DRAWING: Figure 4
【課題】容易に施工することができるとともに、先行エレメントの継手面の損傷を防止できる連続地中壁および連続地中壁の施工方法を提供する。【解決手段】先行エレメント2(第1エレメント)は、第1コンクリート部23と、第1コンクリート部23における後行エレメント3側の端部に沿って、壁高さ方向全体にわたって設けられた波形鋼板5と、を有し、波形鋼板5は、先行エレメント2と後行エレメント3が隣接する壁長さ方向に突出し、壁厚さ方向に延びる凸条部526と、壁長さ方向に凹み、壁厚さ方向に延びる凹条部525と、が壁高さ方向に交互に配列されるとともに第1コンクリート部23側の面に第1コンクリート部23が定着し、後行エレメント3(第2エレメント)は、波形鋼板5の後行エレメント3側の面と定着する第2コンクリート部33を有し、波形鋼板5を後行エレメント3側から接触して覆うように仮設される箱状の保護部材6をさらに有する。【選択図】図4
CONTINUOUS UNDERGROUND WALL AND METHOD FOR CONSTRUCTING CONTINUOUS UNDERGROUND WALL
連続地中壁および連続地中壁の施工方法
MANO HIDEYUKI (author) / KANEMOTO KIYOOMI (author) / KUROKI MITSUHIRO (author) / NAGASAWA MASAAKI (author) / ABE KAZUSHIGE (author)
2021-08-19
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL, AND UNDERGROUND CONTINUOUS WALL
European Patent Office | 2017
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND UNDERGROUND CONTINUOUS WALL
European Patent Office | 2017
|CONSTRUCTION METHOD OF UNDERGROUND CONTINUOUS WALL AND UNDERGROUND CONTINUOUS WALL
European Patent Office | 2018
|UNDERGROUND CONTINUOUS WALL EXCAVATOR AND UNDERGROUND CONTINUOUS WALL EXCAVATION METHOD
European Patent Office | 2017
|UNDERGROUND CONTINUOUS WALL EXCAVATOR AND UNDERGROUND CONTINUOUS WALL EXCAVATION METHOD
European Patent Office | 2017
|