A platform for research: civil engineering, architecture and urbanism
PROTECTIVE WORK AND PROTECTIVE WORK CONSTRUCTING METHOD
To provide a technique to quickly construct an emergency countermeasure work at a disaster area after occurrence of disaster when conducting restoration activity and the like at a region where sediment and drift woods overflow due to a landslide disaster.SOLUTION: A protective work 1 is constructed so as to face an expected flow of debris flood and has a foundation 10 installed underground and a trapper 20 that is connected to the foundation 10 so as to be attachable and detachable and traps objects in the debris flood. The foundation 10 has a plurality of pile members 11, 13 formed of steel pipe. The trapper 20 is installed on the ground G and has column members 21, 23 and a beam member 25.SELECTED DRAWING: Figure 2
【課題】土砂災害により土砂や流木が氾濫した地域の復旧活動等の実施を行うに当たり、災害発生後の被災地に緊急対策工を迅速に施工する技術を提供する。【解決手段】予想される土石流の流れに対向するように構築された防護工1であって、地中に設置された基礎10と、基礎10に着脱自在に連結されて土石流中の物体を捕捉する捕捉体20と、を備える。基礎10は、鋼管により形成された複数の杭部材11、13を有し、捕捉体20は、地盤G上に設置されており、柱部材21、23と、梁部材25を有する。【選択図】図2
PROTECTIVE WORK AND PROTECTIVE WORK CONSTRUCTING METHOD
To provide a technique to quickly construct an emergency countermeasure work at a disaster area after occurrence of disaster when conducting restoration activity and the like at a region where sediment and drift woods overflow due to a landslide disaster.SOLUTION: A protective work 1 is constructed so as to face an expected flow of debris flood and has a foundation 10 installed underground and a trapper 20 that is connected to the foundation 10 so as to be attachable and detachable and traps objects in the debris flood. The foundation 10 has a plurality of pile members 11, 13 formed of steel pipe. The trapper 20 is installed on the ground G and has column members 21, 23 and a beam member 25.SELECTED DRAWING: Figure 2
【課題】土砂災害により土砂や流木が氾濫した地域の復旧活動等の実施を行うに当たり、災害発生後の被災地に緊急対策工を迅速に施工する技術を提供する。【解決手段】予想される土石流の流れに対向するように構築された防護工1であって、地中に設置された基礎10と、基礎10に着脱自在に連結されて土石流中の物体を捕捉する捕捉体20と、を備える。基礎10は、鋼管により形成された複数の杭部材11、13を有し、捕捉体20は、地盤G上に設置されており、柱部材21、23と、梁部材25を有する。【選択図】図2
PROTECTIVE WORK AND PROTECTIVE WORK CONSTRUCTING METHOD
防護工及び防護工を構築する方法
YAMAGUCHI MASAKATSU (author) / YOSHIDA KAZUO (author)
2021-09-27
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2024
|PROTECTIVE NET AND METHOD OF CONSTRUCTING PROTECTIVE NET
European Patent Office | 2024
|