A platform for research: civil engineering, architecture and urbanism
PROTECTIVE WORK AND PROTECTIVE WORK CONSTRUCTING METHOD
To provide a technique to quickly construct a highly strong emergency countermeasure work at a disaster area after occurrence of disaster.SOLUTION: A protective work 1 is constructed so as to face an expected flow of debris flood and has a foundation 10 having tubular pile members 11, 13 embedded underground along an extending direction so as to be spaced away at a predetermined interval to intersect with a flow direction F of the debris flood, column members 21, 23 installed upright from the pile members 11, 13, a beam member 25 that bridges between column members 21, 23 on upstream side F1 in the flow direction F, and a trapper 20 whose position is fixed to the foundation 10 so as to trap objects in the debris flood. The trapper 20 is connected to the foundation 10.SELECTED DRAWING: Figure 2
【課題】災害発生後の被災地に高強度の緊急対策工を迅速に施工する技術を提供する。【解決手段】予想される土石流の流れに対向するように構築された防護工1は、土石流の流れ方向Fに交差するように所定の間隔をあけて、延在方向に沿って地中に埋め込まれた管状の杭部材11,13を有する基礎10と、杭部材11,13から立設する柱部材21,23及び流れ方向Fにおいて上流側F1で柱部材21,23間に架け渡された梁部材25を有し、基礎10に対して位置固定されていて土石流中の物体を捕捉する捕捉体20と、を備え、基礎10に対して捕捉体20は連結されている。【選択図】図2
PROTECTIVE WORK AND PROTECTIVE WORK CONSTRUCTING METHOD
To provide a technique to quickly construct a highly strong emergency countermeasure work at a disaster area after occurrence of disaster.SOLUTION: A protective work 1 is constructed so as to face an expected flow of debris flood and has a foundation 10 having tubular pile members 11, 13 embedded underground along an extending direction so as to be spaced away at a predetermined interval to intersect with a flow direction F of the debris flood, column members 21, 23 installed upright from the pile members 11, 13, a beam member 25 that bridges between column members 21, 23 on upstream side F1 in the flow direction F, and a trapper 20 whose position is fixed to the foundation 10 so as to trap objects in the debris flood. The trapper 20 is connected to the foundation 10.SELECTED DRAWING: Figure 2
【課題】災害発生後の被災地に高強度の緊急対策工を迅速に施工する技術を提供する。【解決手段】予想される土石流の流れに対向するように構築された防護工1は、土石流の流れ方向Fに交差するように所定の間隔をあけて、延在方向に沿って地中に埋め込まれた管状の杭部材11,13を有する基礎10と、杭部材11,13から立設する柱部材21,23及び流れ方向Fにおいて上流側F1で柱部材21,23間に架け渡された梁部材25を有し、基礎10に対して位置固定されていて土石流中の物体を捕捉する捕捉体20と、を備え、基礎10に対して捕捉体20は連結されている。【選択図】図2
PROTECTIVE WORK AND PROTECTIVE WORK CONSTRUCTING METHOD
防護工及び防護工を構築する方法
YAMAGUCHI MASAKATSU (author) / YOSHIDA KAZUO (author)
2021-09-27
Patent
Electronic Resource
Japanese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
European Patent Office | 2024
|PROTECTIVE NET AND METHOD OF CONSTRUCTING PROTECTIVE NET
European Patent Office | 2024
|