HALF-PRECAST STRUCTURE TIDE EMBANKMENT AND METHOD FOR CONSTRUCTING THE SAME
To provide a half-precast structure tide embankment which sufficiently absorbs a construction error generated during construction of a foundation pile in a construction site, and enables highly accurate construction, when a tide embankment having a half-precast structure is constructed, and to provide a method for constructing the same.SOLUTION: A half-precast structure tide embankment is composed of a foundation part and a plurality of tide embankment panels that are arranged on the foundation part and constitute a wall body, in which the foundation part is composed of foundation piles that are partially driven into the ground and have upper ends projecting to the ground surface, leveling concrete for leveling the predetermined range of the ground surface surrounding the foundation piles, and a hooting part that includes the upper ends of the foundation piles above the leveling concrete and is provided so as to support the tide embankment panels, the tide embankment panels are pre-cast concrete members, and the hooting part is composed of cast-in-place concrete.SELECTED DRAWING: Figure 1
【課題】ハーフプレキャスト構造である防潮堤の構築時に、施工現場において基礎杭の施工時に生じる施工誤差を十分に吸収することで、高精度での施工が実現可能なハーフプレキャスト構造防潮堤及びその構築方法を提供する。【解決手段】基礎部と、当該基礎部上に配列され壁体を構成する複数の防潮堤パネルと、からなるハーフプレキャスト構造防潮堤であって、前記基礎部は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる基礎杭と、前記基礎杭を囲む所定範囲の地表面を均す均しコンクリートと、前記均しコンクリートの上方において、前記基礎杭の上端部を内包し、且つ、前記防潮堤パネルを支持するように設けられるフーチング部と、から構成され、前記防潮堤パネルはプレキャストコンクリート部材であり、前記フーチング部は現場打ちコンクリートからなる。【選択図】図1
HALF-PRECAST STRUCTURE TIDE EMBANKMENT AND METHOD FOR CONSTRUCTING THE SAME
To provide a half-precast structure tide embankment which sufficiently absorbs a construction error generated during construction of a foundation pile in a construction site, and enables highly accurate construction, when a tide embankment having a half-precast structure is constructed, and to provide a method for constructing the same.SOLUTION: A half-precast structure tide embankment is composed of a foundation part and a plurality of tide embankment panels that are arranged on the foundation part and constitute a wall body, in which the foundation part is composed of foundation piles that are partially driven into the ground and have upper ends projecting to the ground surface, leveling concrete for leveling the predetermined range of the ground surface surrounding the foundation piles, and a hooting part that includes the upper ends of the foundation piles above the leveling concrete and is provided so as to support the tide embankment panels, the tide embankment panels are pre-cast concrete members, and the hooting part is composed of cast-in-place concrete.SELECTED DRAWING: Figure 1
【課題】ハーフプレキャスト構造である防潮堤の構築時に、施工現場において基礎杭の施工時に生じる施工誤差を十分に吸収することで、高精度での施工が実現可能なハーフプレキャスト構造防潮堤及びその構築方法を提供する。【解決手段】基礎部と、当該基礎部上に配列され壁体を構成する複数の防潮堤パネルと、からなるハーフプレキャスト構造防潮堤であって、前記基礎部は、その一部が地中に打ち込まれ、上端部が地表面上に突出した状態で設けられる基礎杭と、前記基礎杭を囲む所定範囲の地表面を均す均しコンクリートと、前記均しコンクリートの上方において、前記基礎杭の上端部を内包し、且つ、前記防潮堤パネルを支持するように設けられるフーチング部と、から構成され、前記防潮堤パネルはプレキャストコンクリート部材であり、前記フーチング部は現場打ちコンクリートからなる。【選択図】図1
HALF-PRECAST STRUCTURE TIDE EMBANKMENT AND METHOD FOR CONSTRUCTING THE SAME
ハーフプレキャスト構造防潮堤及びその構築方法
TSUJII MASATO (author) / NAKATANI IKUO (author) / TANIGUCHI TETSUNORI (author) / KOYAMA NAOTO (author)
2021-10-11
Patent
Electronic Resource
Japanese
TIDE EMBANKMENT AND METHOD FOR CONSTRUCTING TIDE EMBANKMENT
European Patent Office | 2018
|TIDE EMBANKMENT PANEL, TIDE EMBANKMENT AND CONSTRUCTION METHOD OF TIDE EMBANKMENT
European Patent Office | 2018
|TIDE EMBANKMENT AND CONSTRUCTION METHOD OF TIDE EMBANKMENT
European Patent Office | 2017
|