INSTALLATION METHOD OF BUILDING UNIT
To provide an installation method of a building unit capable of easily installing the building unit at a predetermined position without using a heavy machine such as a crane.SOLUTION: When a building unit 11 constituting a temporary store 10 is moved to a predetermined installation position and installed, a unit moving step is first performed for moving the building unit 11 to the predetermined installation position by moving a carriage 40 in a state in which the building unit 11 is placed on the carriage 40. Thereafter, a leg mounting step is performed in which the leg length of each leg 12 is extended to mount each leg 12 on the ground G so that the building unit 11 is supported by each leg 12. Thereafter, a carriage retracting step is performed for retracting the carriage 40 from the lower position of the building unit 11, and thereafter, a unit installing step is performed for installing the building unit 11 at the predetermined installation position by adjusting the leg length of each leg 12.SELECTED DRAWING: Figure 5
【課題】クレーン等の重機を用いることなく、建物ユニットを所定の位置に容易に設置することができる建物ユニットの設置方法を提供する。【解決手段】仮設店舗10を構成する建物ユニット11を所定の設置位置に移動し設置するに際してはまず、建物ユニット11を台車40の上に載置した状態で、台車40を移動させることで建物ユニット11を所定の設置位置に移動させるユニット移動工程を行う。その後、各脚部12の脚長さを伸ばすことで各脚部12を地面Gの上に載置することでそれら各脚部12により建物ユニット11が支持される状態とする脚部載置工程を行う。その後、台車40を建物ユニット11の下方位置から退避させる台車退避工程を行う。その後、各脚部12の脚長さを調整することで建物ユニット11を所定の設置位置に設置するユニット設置工程を行う。【選択図】図5
INSTALLATION METHOD OF BUILDING UNIT
To provide an installation method of a building unit capable of easily installing the building unit at a predetermined position without using a heavy machine such as a crane.SOLUTION: When a building unit 11 constituting a temporary store 10 is moved to a predetermined installation position and installed, a unit moving step is first performed for moving the building unit 11 to the predetermined installation position by moving a carriage 40 in a state in which the building unit 11 is placed on the carriage 40. Thereafter, a leg mounting step is performed in which the leg length of each leg 12 is extended to mount each leg 12 on the ground G so that the building unit 11 is supported by each leg 12. Thereafter, a carriage retracting step is performed for retracting the carriage 40 from the lower position of the building unit 11, and thereafter, a unit installing step is performed for installing the building unit 11 at the predetermined installation position by adjusting the leg length of each leg 12.SELECTED DRAWING: Figure 5
【課題】クレーン等の重機を用いることなく、建物ユニットを所定の位置に容易に設置することができる建物ユニットの設置方法を提供する。【解決手段】仮設店舗10を構成する建物ユニット11を所定の設置位置に移動し設置するに際してはまず、建物ユニット11を台車40の上に載置した状態で、台車40を移動させることで建物ユニット11を所定の設置位置に移動させるユニット移動工程を行う。その後、各脚部12の脚長さを伸ばすことで各脚部12を地面Gの上に載置することでそれら各脚部12により建物ユニット11が支持される状態とする脚部載置工程を行う。その後、台車40を建物ユニット11の下方位置から退避させる台車退避工程を行う。その後、各脚部12の脚長さを調整することで建物ユニット11を所定の設置位置に設置するユニット設置工程を行う。【選択図】図5
INSTALLATION METHOD OF BUILDING UNIT
建物ユニットの設置方法
SUGIYAMA KENICHI (author)
2022-01-13
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS