A platform for research: civil engineering, architecture and urbanism
METHOD OF INSTALLING GALVANIC ANODE MATERIAL
To improve the efficiency of a work of installing a galvanic anode material on a concrete structure.SOLUTION: A first anchor blot and a second anchor bolt are arranged on a surface of a concrete structure. A fixture having a first bolt hole corresponding to the first anchor bolt and a second bolt hole corresponding to the second anchor bolt at the respective end parts is fixed to a surface of the concrete structure through the respective anchor bolts. A first anode installation hole is drilled with a core drill fitted to the fixture in such a manner that a first point is a cutter center, the first point forming, with respective bolt hole center points, a first isosceles right triangle with its bottom side being a straight line connecting the bolt hole center points. Then, a second anode installation hole is drilled with the core drill fitted to the fixture in such a manner that a second point is the cutter center, the second point forming, with the bolt hole center points, a second isosceles right triangle which is line symmetric with respect to the first isosceles right triangle with the straight line as an axis.SELECTED DRAWING: Figure 11
【課題】流電陽極材をコンクリート構造物に設置する作業の効率を向上させる。【解決手段】コンクリート構造物の表面に第1のアンカーボルトおよび第2のアンカーボルトを設置し、両端部に第1のアンカーボルトに対応する第1のボルト孔および第2のアンカーボルトに対応する第2のボルト孔を有する治具を、それぞれのアンカーボルトを通じてコンクリート構造物の表面に固定し、それぞれのボルト孔中心点同士を結んだ直線を底辺とする第1の直角二等辺三角を、それぞれのボルト孔中心点とで形成する第1の点がカッター中心となるように治具にコアドリルを装着して第1の陽極設置穴を削孔し、前記直線を軸として第1の直角二等辺三角に対して線対称をなす第2の直角二等辺三角を、それぞれのボルト孔中心点との間で形成する第2の点がカッター中心となるように治具にコアドリルを装着して第2の陽極設置穴を削孔する。【選択図】図11
METHOD OF INSTALLING GALVANIC ANODE MATERIAL
To improve the efficiency of a work of installing a galvanic anode material on a concrete structure.SOLUTION: A first anchor blot and a second anchor bolt are arranged on a surface of a concrete structure. A fixture having a first bolt hole corresponding to the first anchor bolt and a second bolt hole corresponding to the second anchor bolt at the respective end parts is fixed to a surface of the concrete structure through the respective anchor bolts. A first anode installation hole is drilled with a core drill fitted to the fixture in such a manner that a first point is a cutter center, the first point forming, with respective bolt hole center points, a first isosceles right triangle with its bottom side being a straight line connecting the bolt hole center points. Then, a second anode installation hole is drilled with the core drill fitted to the fixture in such a manner that a second point is the cutter center, the second point forming, with the bolt hole center points, a second isosceles right triangle which is line symmetric with respect to the first isosceles right triangle with the straight line as an axis.SELECTED DRAWING: Figure 11
【課題】流電陽極材をコンクリート構造物に設置する作業の効率を向上させる。【解決手段】コンクリート構造物の表面に第1のアンカーボルトおよび第2のアンカーボルトを設置し、両端部に第1のアンカーボルトに対応する第1のボルト孔および第2のアンカーボルトに対応する第2のボルト孔を有する治具を、それぞれのアンカーボルトを通じてコンクリート構造物の表面に固定し、それぞれのボルト孔中心点同士を結んだ直線を底辺とする第1の直角二等辺三角を、それぞれのボルト孔中心点とで形成する第1の点がカッター中心となるように治具にコアドリルを装着して第1の陽極設置穴を削孔し、前記直線を軸として第1の直角二等辺三角に対して線対称をなす第2の直角二等辺三角を、それぞれのボルト孔中心点との間で形成する第2の点がカッター中心となるように治具にコアドリルを装着して第2の陽極設置穴を削孔する。【選択図】図11
METHOD OF INSTALLING GALVANIC ANODE MATERIAL
流電陽極材の設置方法
KAMOYA TOMOSHIGE (author)
2022-01-21