GONDOLA DEVICE
To provide a gondola device capable of inexpensively correcting a left and right tilt of a work floor.SOLUTION: A gondola body of a gondola device is provided with a tilt correction device 8 to change a height position of a hanging point of a left cable 41 to hang a left edge of a work floor with respect to the work floor and to change a height position of a hanging point of a right cable 42 to hang a right edge of the work floor with respect to the work floor in order to correct a left and right tilt of the work floor. The tilt correction device 8 consists of two guide sheave groups 81, 82 arranged at intervals in a moving direction of the cables 41, 42, first and second take-up sheave groups 83, 84 arranged between both the guide sheave groups 81, 82, and moving means 9 to move the first and second take-up sheave groups 83, 84 so that a cable path length of the left cable 41 and the right cable 42 can be changed between both the guide sheave groups 81, 82. The left cable 41 is hung on the first take-up sheave group 83 and the right cable 42 is hung on the second take-up sheave group 84.SELECTED DRAWING: Figure 6
【課題】安価に作業床の左右の傾きを矯正しうるゴンドラ装置を提供する。【解決手段】ゴンドラ装置のゴンドラ本体に、作業床の左端部を吊り下げる左用索条41の作業床に対する吊り点の高さ位置と、作業床の右端部を吊り下げる右用索条42の作業床に対する吊り点の高さ位置とを変更して作業床の左右の傾きを矯正する傾き矯正装置8が設けられている。傾き矯正装置8が、索条41,42の移動方向に間隔をおいて配置された2つの案内シーブ群81,82と、両案内シーブ群81,82間に配置された第1および第2テークアップシーブ群83,84と、両案内シーブ群81,82間での左用索条41および右用索条42の経路長を変更しうるように第1テークアップシーブ群83および第2テークアップシーブ群84を移動させる移動手段9とからなる。第1テークアップシーブ群83に左用索条41が掛けられ、第2テークアップシーブ群84に右用索条42が掛けられている。【選択図】図6
GONDOLA DEVICE
To provide a gondola device capable of inexpensively correcting a left and right tilt of a work floor.SOLUTION: A gondola body of a gondola device is provided with a tilt correction device 8 to change a height position of a hanging point of a left cable 41 to hang a left edge of a work floor with respect to the work floor and to change a height position of a hanging point of a right cable 42 to hang a right edge of the work floor with respect to the work floor in order to correct a left and right tilt of the work floor. The tilt correction device 8 consists of two guide sheave groups 81, 82 arranged at intervals in a moving direction of the cables 41, 42, first and second take-up sheave groups 83, 84 arranged between both the guide sheave groups 81, 82, and moving means 9 to move the first and second take-up sheave groups 83, 84 so that a cable path length of the left cable 41 and the right cable 42 can be changed between both the guide sheave groups 81, 82. The left cable 41 is hung on the first take-up sheave group 83 and the right cable 42 is hung on the second take-up sheave group 84.SELECTED DRAWING: Figure 6
【課題】安価に作業床の左右の傾きを矯正しうるゴンドラ装置を提供する。【解決手段】ゴンドラ装置のゴンドラ本体に、作業床の左端部を吊り下げる左用索条41の作業床に対する吊り点の高さ位置と、作業床の右端部を吊り下げる右用索条42の作業床に対する吊り点の高さ位置とを変更して作業床の左右の傾きを矯正する傾き矯正装置8が設けられている。傾き矯正装置8が、索条41,42の移動方向に間隔をおいて配置された2つの案内シーブ群81,82と、両案内シーブ群81,82間に配置された第1および第2テークアップシーブ群83,84と、両案内シーブ群81,82間での左用索条41および右用索条42の経路長を変更しうるように第1テークアップシーブ群83および第2テークアップシーブ群84を移動させる移動手段9とからなる。第1テークアップシーブ群83に左用索条41が掛けられ、第2テークアップシーブ群84に右用索条42が掛けられている。【選択図】図6
GONDOLA DEVICE
ゴンドラ装置
KISHIMOTO TAKESHI (author) / HORI MASAKAZU (author) / KUBO TATSUYA (author)