A platform for research: civil engineering, architecture and urbanism
CONSTRUCTION METHOD FOR STEEL PIPE PILE AND STEEL PIPE PILE
To provide a construction method for a steel pipe pile and a steel pipe pile which reduce labor and a cost for working due to a configuration that can be simply worked, and can eliminate disturbance of a lower ground.SOLUTION: In a construction method for a steel pipe pile 1 installed in the ground G, the steel pipe pile 1 includes a pile body 2 composed of a steel pipe, and a plate-like expansion blade 3 that blocks a lower end 2a of the pile body 2 by a plate surface perpendicular to a pile axis O direction, is expanded by an outer peripheral surface 2b of the pile body 2 when viewed from the pile axis O direction, and has at least one corner part 3c formed on a plate outer peripheral edge, and the construction method includes a step of applying a pressure to the lower side of the steel pipe pile 1, and press fitting the expansion blade 3 to the ground G in a state where a lower surface 3b of the expansion blade 3 is brought into direct contact with the ground G, and a step of rotating the steel pipe pile 1, and excavating the ground G.SELECTED DRAWING: Figure 1
【課題】簡単に加工できる構成とすることで、加工にかかる手間とコストを低減するとともに、下部地盤の乱れを無くすことができる鋼管杭の施工方法および鋼管杭を提供する。【解決手段】地盤G中に設置される鋼管杭1の施工方法において、鋼管杭1は、鋼管からなる杭本体2と、杭本体2の下端2aを杭軸O方向に直交する板面によって閉塞するとともに、杭軸O方向から見て杭本体2の外周面2bより拡大され、少なくとも1つの角部3cが板外周縁に形成された平板状の拡大翼3と、を備え、拡大翼3の下面3bを地盤Gに直接接触させた状態で、鋼管杭1に対して下方に圧力を与えて拡大翼3を地盤Gに圧入させる工程と、鋼管杭1を回転させて地盤Gを掘削する工程と、を有する構成とした。【選択図】図1
CONSTRUCTION METHOD FOR STEEL PIPE PILE AND STEEL PIPE PILE
To provide a construction method for a steel pipe pile and a steel pipe pile which reduce labor and a cost for working due to a configuration that can be simply worked, and can eliminate disturbance of a lower ground.SOLUTION: In a construction method for a steel pipe pile 1 installed in the ground G, the steel pipe pile 1 includes a pile body 2 composed of a steel pipe, and a plate-like expansion blade 3 that blocks a lower end 2a of the pile body 2 by a plate surface perpendicular to a pile axis O direction, is expanded by an outer peripheral surface 2b of the pile body 2 when viewed from the pile axis O direction, and has at least one corner part 3c formed on a plate outer peripheral edge, and the construction method includes a step of applying a pressure to the lower side of the steel pipe pile 1, and press fitting the expansion blade 3 to the ground G in a state where a lower surface 3b of the expansion blade 3 is brought into direct contact with the ground G, and a step of rotating the steel pipe pile 1, and excavating the ground G.SELECTED DRAWING: Figure 1
【課題】簡単に加工できる構成とすることで、加工にかかる手間とコストを低減するとともに、下部地盤の乱れを無くすことができる鋼管杭の施工方法および鋼管杭を提供する。【解決手段】地盤G中に設置される鋼管杭1の施工方法において、鋼管杭1は、鋼管からなる杭本体2と、杭本体2の下端2aを杭軸O方向に直交する板面によって閉塞するとともに、杭軸O方向から見て杭本体2の外周面2bより拡大され、少なくとも1つの角部3cが板外周縁に形成された平板状の拡大翼3と、を備え、拡大翼3の下面3bを地盤Gに直接接触させた状態で、鋼管杭1に対して下方に圧力を与えて拡大翼3を地盤Gに圧入させる工程と、鋼管杭1を回転させて地盤Gを掘削する工程と、を有する構成とした。【選択図】図1
CONSTRUCTION METHOD FOR STEEL PIPE PILE AND STEEL PIPE PILE
鋼管杭の施工方法および鋼管杭
UCHIYAMA MASANORI (author) / YAMATO SHINICHI (author) / TAKECHI KOTARO (author)
2022-04-07
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE PILE JOINT, STEEL PIPE PILE, AND CONSTRUCTION METHOD OF STEEL PIPE PILE
European Patent Office | 2021
|STEEL PIPE PILE AND CONSTRUCTION METHOD FOR STEEL PIPE PILE
European Patent Office | 2020
|CONSTRUCTION METHOD OF STEEL PIPE PILE AND STEEL PIPE PILE
European Patent Office | 2020
|STEEL PIPE PILE DEVICE, STEEL PIPE PILE AND METHOD FOR INSTALLING STEEL PIPE PILE
European Patent Office | 2018
|