CONSTRUCTION FIXTURE AND ERECTING METHOD OF ERECTION OBJECT
To provide a construction fixture capable of securing workability after fixing an erection object, while enhancing the installation property of the erection object, and an installation method of the erection object.SOLUTION: A construction fixture 30 is used for temporarily fixing an erection object 1 at a first installation part 10, when erecting the erection object 1 at the first installation part 10, and has a first connection part 40 connectable to the erection object 1, a second connection part 50 connectable to the first installation part 10 directly or indirectly, and a connection part 60 for connecting the first connection part 40 to the second connection part 50. The second connection part 50 and the connection part 60 are structured in such a way that the second connection part 50 and a part of the connection part 60 being a part of the cut connection part 60 and connected to the second connection part 50 can be left buried inside a second installation part 20.SELECTED DRAWING: Figure 1
【課題】立設対象の設置性を高めながら、立設対象の本固定後の作業性を確保することが可能となる、建設用治具、及び立設対象の立設方法を提供すること。【解決手段】建設用治具30は、立設対象1を第1設置部10に立設する際に、立設対象1を第1設置部10に仮固定するためのものであって、立設対象1と接続可能な第1接続部40と、第1設置部10と直接又は間接に接続可能な第2接続部50と、第1接続部40と第2接続部50とを連結する連結部60と、を備え、第2接続部50と、切断された連結部60の一部であって第2接続部50と連結された連結部60の一部とが第2設置部20の内部に埋め殺し可能となるように、第2接続部50と連結部60とを構成した。【選択図】図1
CONSTRUCTION FIXTURE AND ERECTING METHOD OF ERECTION OBJECT
To provide a construction fixture capable of securing workability after fixing an erection object, while enhancing the installation property of the erection object, and an installation method of the erection object.SOLUTION: A construction fixture 30 is used for temporarily fixing an erection object 1 at a first installation part 10, when erecting the erection object 1 at the first installation part 10, and has a first connection part 40 connectable to the erection object 1, a second connection part 50 connectable to the first installation part 10 directly or indirectly, and a connection part 60 for connecting the first connection part 40 to the second connection part 50. The second connection part 50 and the connection part 60 are structured in such a way that the second connection part 50 and a part of the connection part 60 being a part of the cut connection part 60 and connected to the second connection part 50 can be left buried inside a second installation part 20.SELECTED DRAWING: Figure 1
【課題】立設対象の設置性を高めながら、立設対象の本固定後の作業性を確保することが可能となる、建設用治具、及び立設対象の立設方法を提供すること。【解決手段】建設用治具30は、立設対象1を第1設置部10に立設する際に、立設対象1を第1設置部10に仮固定するためのものであって、立設対象1と接続可能な第1接続部40と、第1設置部10と直接又は間接に接続可能な第2接続部50と、第1接続部40と第2接続部50とを連結する連結部60と、を備え、第2接続部50と、切断された連結部60の一部であって第2接続部50と連結された連結部60の一部とが第2設置部20の内部に埋め殺し可能となるように、第2接続部50と連結部60とを構成した。【選択図】図1
CONSTRUCTION FIXTURE AND ERECTING METHOD OF ERECTION OBJECT
建設用治具、及び立設対象の立設方法
SAKAMOTO YUTA (author)
2022-04-15
Patent
Electronic Resource
Japanese
HEAVY OBJECT ERECTION DEVICE AND METHOD FOR ERECTING THE SAME
European Patent Office | 2024
|Erecting method of pier-beam integrated construction bridge girder erection machine
European Patent Office | 2022
|