A platform for research: civil engineering, architecture and urbanism
RACECOURSE MATERIAL REMOVAL METHOD
To provide a racecourse material removal method for reducing the amount of leftover racecourse material while suppressing damage to a permeable sheet when removing the racecourse material with a construction machine.SOLUTION: In a racecourse 100 including a base course 140 laid on an upper surface of a roadbed, a permeable sheet 160 laid on the upper surface of the base course 140, and a racecourse material 180 laid on the upper surface of the permeable sheet 160, a cylindrical-shaped or columnar-shaped attachment 600 is attached to the end of an opening located below a bucket 330 in a state of removing the racecourse material 180 with the bucket 330 of a wheel loader 200. The wheel loader 200 is operated to scoop and remove the racecourse material 180 with the bucket 330 while the attachment 600 is in contact with the permeable sheet 160. When a motor grader is used as a construction machine, the cylindrical-shaped or columnar-shaped attachment may be attached to the lower end of a blade.SELECTED DRAWING: Figure 7
【課題】建設機械で馬場材を除去するとき、透水シートの破損を抑制しつつ、馬場材の取り残しを少なくする馬場材除去方法を提供する。【解決手段】路床の上面に敷設された路盤140、路盤140の上面に敷設された透水シート160、及び透水シート160の上面に敷設された馬場材180を含んだ馬場100において、馬場材180をホイールローダ200のバケット330で除去する姿勢において、バケット330の下方に位置する開口端部に円筒形状又は円柱形状のアタッチメント600を取り付ける。そして、アタッチメント600を透水シート160に接触させながら、ホイールローダ200を走行させて馬場材180をバケット330で掬い取って除去する。また、建設機械としてモーターグレーダを使用する場合、ブレードの下端部に円筒形状又は円柱形状のアタッチメントを取り付けるようにしてもよい。【選択図】図7
RACECOURSE MATERIAL REMOVAL METHOD
To provide a racecourse material removal method for reducing the amount of leftover racecourse material while suppressing damage to a permeable sheet when removing the racecourse material with a construction machine.SOLUTION: In a racecourse 100 including a base course 140 laid on an upper surface of a roadbed, a permeable sheet 160 laid on the upper surface of the base course 140, and a racecourse material 180 laid on the upper surface of the permeable sheet 160, a cylindrical-shaped or columnar-shaped attachment 600 is attached to the end of an opening located below a bucket 330 in a state of removing the racecourse material 180 with the bucket 330 of a wheel loader 200. The wheel loader 200 is operated to scoop and remove the racecourse material 180 with the bucket 330 while the attachment 600 is in contact with the permeable sheet 160. When a motor grader is used as a construction machine, the cylindrical-shaped or columnar-shaped attachment may be attached to the lower end of a blade.SELECTED DRAWING: Figure 7
【課題】建設機械で馬場材を除去するとき、透水シートの破損を抑制しつつ、馬場材の取り残しを少なくする馬場材除去方法を提供する。【解決手段】路床の上面に敷設された路盤140、路盤140の上面に敷設された透水シート160、及び透水シート160の上面に敷設された馬場材180を含んだ馬場100において、馬場材180をホイールローダ200のバケット330で除去する姿勢において、バケット330の下方に位置する開口端部に円筒形状又は円柱形状のアタッチメント600を取り付ける。そして、アタッチメント600を透水シート160に接触させながら、ホイールローダ200を走行させて馬場材180をバケット330で掬い取って除去する。また、建設機械としてモーターグレーダを使用する場合、ブレードの下端部に円筒形状又は円柱形状のアタッチメントを取り付けるようにしてもよい。【選択図】図7
RACECOURSE MATERIAL REMOVAL METHOD
馬場材除去方法
SASAKI TAKUO (author) / SHIBUKI YOICHI (author)
2022-05-12
Patent
Electronic Resource
Japanese
UB Braunschweig | 2013
|Ascot Racecourse – Architektur trifft Tradition
Wiley | 2007
|LONGCHAMP RACECOURSE, PARIS DOMINIQUE PERRAULT ARCHITECTURE
British Library Online Contents | 2018
|Ascot Racecourse - Architektur trifft Tradition
Online Contents | 2007
|And they're off - Ascot racecourse redevelopment
Online Contents | 2004