A platform for research: civil engineering, architecture and urbanism
ASPHALT MATERIAL COMPACTION METHOD
To provide an asphalt material compaction method using at least one soil compactor having at least one compaction roller having a disposed motion generation structure.SOLUTION: A method in which an upper boundary temperature (O) and/or a lower boundary temperature (U) are set depending on at least one environmental parameter (T) that affects the cooling behavior of an asphalt material to be compacted, includes: a) a step of detecting an asphalt temperature of an asphalt material (A) to be compacted; b) a step of statically compacting the asphalt material (A) by the inactive motion generation structure of at least one compaction roller when the asphalt temperature exceeds the upper boundary temperature (O); and c) a step of statically compacting the asphalt material (A) by the inactive motion generation structure of at least one compaction roller when the asphalt temperature falls below the lower boundary temperature (U).SELECTED DRAWING: Figure 2
【課題】配設された運動生成構造を有する少なくとも1つの締固めローラを備えた、少なくとも1つのソイルコンパクタを用いて、アスファルト材料を締固めるための方法を提供する。【解決手段】a)締固められるべきアスファルト材料(A)のアスファルト温度を検出するステップと、b)アスファルト温度が上側境界温度(O)を上回る場合に、少なくとも1つの締固めローラの、非アクティブな運動生成構造によって、アスファルト材料(A)を静的に締固めるステップと、c)アスファルト温度が下側境界温度(U)を下回る場合に、少なくとも1つの締固めローラの、非アクティブな運動生成構造によって、アスファルト材料(A)を静的に締固めるステップと、を含んでおり、上側境界温度(O)又は/及び下側境界温度(U)は、締固められるべきアスファルト材料の冷却挙動に影響を与える少なくとも1つの環境パラメータ(T)に依存して設定される方法。【選択図】図2
ASPHALT MATERIAL COMPACTION METHOD
To provide an asphalt material compaction method using at least one soil compactor having at least one compaction roller having a disposed motion generation structure.SOLUTION: A method in which an upper boundary temperature (O) and/or a lower boundary temperature (U) are set depending on at least one environmental parameter (T) that affects the cooling behavior of an asphalt material to be compacted, includes: a) a step of detecting an asphalt temperature of an asphalt material (A) to be compacted; b) a step of statically compacting the asphalt material (A) by the inactive motion generation structure of at least one compaction roller when the asphalt temperature exceeds the upper boundary temperature (O); and c) a step of statically compacting the asphalt material (A) by the inactive motion generation structure of at least one compaction roller when the asphalt temperature falls below the lower boundary temperature (U).SELECTED DRAWING: Figure 2
【課題】配設された運動生成構造を有する少なくとも1つの締固めローラを備えた、少なくとも1つのソイルコンパクタを用いて、アスファルト材料を締固めるための方法を提供する。【解決手段】a)締固められるべきアスファルト材料(A)のアスファルト温度を検出するステップと、b)アスファルト温度が上側境界温度(O)を上回る場合に、少なくとも1つの締固めローラの、非アクティブな運動生成構造によって、アスファルト材料(A)を静的に締固めるステップと、c)アスファルト温度が下側境界温度(U)を下回る場合に、少なくとも1つの締固めローラの、非アクティブな運動生成構造によって、アスファルト材料(A)を静的に締固めるステップと、を含んでおり、上側境界温度(O)又は/及び下側境界温度(U)は、締固められるべきアスファルト材料の冷却挙動に影響を与える少なくとも1つの環境パラメータ(T)に依存して設定される方法。【選択図】図2
ASPHALT MATERIAL COMPACTION METHOD
アスファルト材料を締固めるための方法
AXEL MUEHLHAUSEN (author) / KLAUS MEINDL (author) / FRANK STEGNER (author)
2022-05-18
Patent
Electronic Resource
Japanese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Taylor & Francis Verlag | 2011
|British Library Online Contents | 2011
|British Library Conference Proceedings | 1990
|Well lid periphery asphalt compaction device and compaction method
European Patent Office | 2024
|