TEMPORARY STRUCTURE, TEMPORARY STRUCTURE ASSEMBLY STRUCTURE AND BUILDING CONSTRUCTION METHOD
To provide a temporary structure for fall prevention with improved workability.SOLUTION: A temporary structure is a temporary handrail 20 that is used during the construction of a building and mounted on the building body. The temporary handrail 20 includes a strut member 21 extending long in the vertical direction, a base member 22 provided at the lower end of the strut member 21 and in contact with the upper surface of the construction member (beam) of the building body, and a first protruding member 23 and a second protruding member 24 that are provided at an interval in the length direction of the base member 22, protrude downward from the base member 22, and are inserted into through holes provided at an interval on the upper surface of the beam, respectively. The first protruding member 23 protrudes so as to be longer than the second protruding member 24.SELECTED DRAWING: Figure 4
【課題】施工性向上を図った転落防止用の仮設構造体を提供する。【解決手段】仮設構造体は、建物の施工中に用いられ、建物本体上に取り付けられる仮設手摺り20である。仮設手摺り20は、上下方向に長尺に延びている支柱部材21と、支柱部材21の下端部に設けられ、建物本体の施工部材(梁)の上面に当接するベース部材22と、ベース部材22の長さ方向において間隔を空けて設けられ、ベース部材22から下方に向かってそれぞれ突出し、梁の上面に間隔を空けて設けられた貫通穴にそれぞれ挿通される第1突出部材23及び第2突出部材24と、を備えている。第1突出部材23が、第2突出部材24よりも長尺となるように突出している。【選択図】図4
TEMPORARY STRUCTURE, TEMPORARY STRUCTURE ASSEMBLY STRUCTURE AND BUILDING CONSTRUCTION METHOD
To provide a temporary structure for fall prevention with improved workability.SOLUTION: A temporary structure is a temporary handrail 20 that is used during the construction of a building and mounted on the building body. The temporary handrail 20 includes a strut member 21 extending long in the vertical direction, a base member 22 provided at the lower end of the strut member 21 and in contact with the upper surface of the construction member (beam) of the building body, and a first protruding member 23 and a second protruding member 24 that are provided at an interval in the length direction of the base member 22, protrude downward from the base member 22, and are inserted into through holes provided at an interval on the upper surface of the beam, respectively. The first protruding member 23 protrudes so as to be longer than the second protruding member 24.SELECTED DRAWING: Figure 4
【課題】施工性向上を図った転落防止用の仮設構造体を提供する。【解決手段】仮設構造体は、建物の施工中に用いられ、建物本体上に取り付けられる仮設手摺り20である。仮設手摺り20は、上下方向に長尺に延びている支柱部材21と、支柱部材21の下端部に設けられ、建物本体の施工部材(梁)の上面に当接するベース部材22と、ベース部材22の長さ方向において間隔を空けて設けられ、ベース部材22から下方に向かってそれぞれ突出し、梁の上面に間隔を空けて設けられた貫通穴にそれぞれ挿通される第1突出部材23及び第2突出部材24と、を備えている。第1突出部材23が、第2突出部材24よりも長尺となるように突出している。【選択図】図4
TEMPORARY STRUCTURE, TEMPORARY STRUCTURE ASSEMBLY STRUCTURE AND BUILDING CONSTRUCTION METHOD
仮設構造体、仮設構造体の組み付け構造及び建物施工方法
HAYASHI TEPPEI (author) / MINAMINO TAKAHIRO (author) / OYAMA MAKOTO (author) / MATSUBARA SATOSHI (author)
2022-06-06
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2019
|Temporary temporary bridge structure and construction method
European Patent Office | 2024
|TEMPORARY FOUNDATION STRUCTURE AND CONSTRUCTION METHOD OF TEMPORARY FOUNDATION STRUCTURE
European Patent Office | 2024
|