EARTH RETAINING WALL CONSTRUCTION METHOD, AND SOIL CEMENT CONTINUOUS WALL
To provide an earth retaining wall construction method capable of forming a soil cement continuous wall in which core materials are built only in necessary positions simply at low cost, and to provide a soil cement continuous wall.SOLUTION: An earth retaining wall construction method comprises: a drilling step of drilling a ground to form an excavation hole 4; and a core material building-in step of building a core material 3 into the excavation hole 4. In the drilling step, in-situ soil and a cement slurry are mixed and stirred to form soil cement 6 in the excavation hole 4. The core material building-in step performs: an insertion work of inserting the core material 3 to a predetermined depth or deeper using a plier 7 holding an upper end of the core material 3; an alternative receiving step of hanging the core material 3 by a cradle installed on the ground; and a pulling-out step of pulling the plier 7 out in a state where the core material 3 is hung.SELECTED DRAWING: Figure 3
【課題】簡易かつ安価に、必要な位置のみに芯材が建て込まれたソイルセメント連続壁を形成することを可能とした山留壁構築方法およびソイルセメント連続壁を提案する。【解決手段】地盤を削孔して掘削孔4を形成する削孔工程と、掘削孔4内に芯材3を建て込む芯材建込工程とを備える山留壁構築方法である。削孔工程では、掘削孔4内において原位置土とセメントスラリーとを混錬してソイルセメント6を生成する。芯材建込工程では、芯材3の上端部を保持するヤットコ7を利用して芯材3を所定の深さ以深に挿入する挿入作業と、地上に設置された架台で芯材3を吊持する受代え作業と、芯材3を吊持した状態でヤットコ7を引き抜く引抜作業とを行う。【選択図】図3
EARTH RETAINING WALL CONSTRUCTION METHOD, AND SOIL CEMENT CONTINUOUS WALL
To provide an earth retaining wall construction method capable of forming a soil cement continuous wall in which core materials are built only in necessary positions simply at low cost, and to provide a soil cement continuous wall.SOLUTION: An earth retaining wall construction method comprises: a drilling step of drilling a ground to form an excavation hole 4; and a core material building-in step of building a core material 3 into the excavation hole 4. In the drilling step, in-situ soil and a cement slurry are mixed and stirred to form soil cement 6 in the excavation hole 4. The core material building-in step performs: an insertion work of inserting the core material 3 to a predetermined depth or deeper using a plier 7 holding an upper end of the core material 3; an alternative receiving step of hanging the core material 3 by a cradle installed on the ground; and a pulling-out step of pulling the plier 7 out in a state where the core material 3 is hung.SELECTED DRAWING: Figure 3
【課題】簡易かつ安価に、必要な位置のみに芯材が建て込まれたソイルセメント連続壁を形成することを可能とした山留壁構築方法およびソイルセメント連続壁を提案する。【解決手段】地盤を削孔して掘削孔4を形成する削孔工程と、掘削孔4内に芯材3を建て込む芯材建込工程とを備える山留壁構築方法である。削孔工程では、掘削孔4内において原位置土とセメントスラリーとを混錬してソイルセメント6を生成する。芯材建込工程では、芯材3の上端部を保持するヤットコ7を利用して芯材3を所定の深さ以深に挿入する挿入作業と、地上に設置された架台で芯材3を吊持する受代え作業と、芯材3を吊持した状態でヤットコ7を引き抜く引抜作業とを行う。【選択図】図3
EARTH RETAINING WALL CONSTRUCTION METHOD, AND SOIL CEMENT CONTINUOUS WALL
山留壁構築方法およびソイルセメント連続壁
MOGI TAKUYA (author) / AOKI TOMOKAZU (author) / UEDA MOTOHIRO (author)
2022-06-22
Patent
Electronic Resource
Japanese
IPC:
E02D
FOUNDATIONS
,
Gründungen
EARTH RETAINING WALL, CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2019
|Earth retaining wall construction device and earth retaining wall construction method
European Patent Office | 2021
|Construction method of earth retaining wall and continuous underground wall
European Patent Office | 2024
|EARTH RETAINING WALL, AND CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2022
|EARTH RETAINING WALL AND CONSTRUCTION METHOD OF EARTH RETAINING WALL
European Patent Office | 2015
|