COLUMN-BEAM FRAME
To provide a reinforced-concrete column-beam frame that, when a flexural yielding hinge position of a beam is moved to a beam central part side as compared to a conventional one, can restrain extension of a crack.SOLUTION: A column-beam frame 1 comprises a reinforced-concrete column 10 and reinforced-concrete beams 20 joined to the column 10. Beam main reinforcements 30 of the beam 20 are constituted of first beam main reinforcements 30A that are penetrated to a column-beam joint part 11 of the column 10 and placed at a beam end part 20A, and second beam main reinforcements 30B provided at a beam central part 20B of the beam 20. The first beam main reinforcements 30A are provided with bundled reinforcements 41 which bundle multiple pieces of closed type stirrups 40 placed so as to surround first stage main reinforcements 31, 33 placed at upper and lower end sides of the beam 20 and second stage main reinforcements 32, 34 placed at inner sides of the beam 20.SELECTED DRAWING: Figure 2
【課題】梁の曲げ降伏ヒンジ位置を従来よりも梁中央部側に移動した場合に、ひび割れの伸展を抑制できる、鉄筋コンクリート造の柱梁架構を提供すること。【解決手段】柱梁架構1は、鉄筋コンクリート造の柱10と、柱10に接合された鉄筋コンクリート造の梁20と、を備える。梁20の梁主筋30は、柱10の柱梁接合部11を貫通して梁端部20Aに設置される第1梁主筋30Aと、梁20の梁中央部20Bに設けられた第2梁主筋30Bと、で構成される。第1梁主筋30Aには、梁20の上下端側に配置される一段目主筋31、33と、梁20の内部側に配置される二段目主筋32、34と、を囲むように配置される閉鎖型のスタラップ40を複数本束ねた束ね筋41が設けられる。【選択図】図2
COLUMN-BEAM FRAME
To provide a reinforced-concrete column-beam frame that, when a flexural yielding hinge position of a beam is moved to a beam central part side as compared to a conventional one, can restrain extension of a crack.SOLUTION: A column-beam frame 1 comprises a reinforced-concrete column 10 and reinforced-concrete beams 20 joined to the column 10. Beam main reinforcements 30 of the beam 20 are constituted of first beam main reinforcements 30A that are penetrated to a column-beam joint part 11 of the column 10 and placed at a beam end part 20A, and second beam main reinforcements 30B provided at a beam central part 20B of the beam 20. The first beam main reinforcements 30A are provided with bundled reinforcements 41 which bundle multiple pieces of closed type stirrups 40 placed so as to surround first stage main reinforcements 31, 33 placed at upper and lower end sides of the beam 20 and second stage main reinforcements 32, 34 placed at inner sides of the beam 20.SELECTED DRAWING: Figure 2
【課題】梁の曲げ降伏ヒンジ位置を従来よりも梁中央部側に移動した場合に、ひび割れの伸展を抑制できる、鉄筋コンクリート造の柱梁架構を提供すること。【解決手段】柱梁架構1は、鉄筋コンクリート造の柱10と、柱10に接合された鉄筋コンクリート造の梁20と、を備える。梁20の梁主筋30は、柱10の柱梁接合部11を貫通して梁端部20Aに設置される第1梁主筋30Aと、梁20の梁中央部20Bに設けられた第2梁主筋30Bと、で構成される。第1梁主筋30Aには、梁20の上下端側に配置される一段目主筋31、33と、梁20の内部側に配置される二段目主筋32、34と、を囲むように配置される閉鎖型のスタラップ40を複数本束ねた束ね筋41が設けられる。【選択図】図2
COLUMN-BEAM FRAME
柱梁架構
TAKAHASHI TOMOYA (author) / SUGIYAMA TOMOAKI (author) / WATANABE HIDEYOSHI (author) / SAKAI YOSHINAO (author) / SHINNO TATSU (author) / WAKITA TAKUYA (author) / KAWAMOTO SHINICHIRO (author)
2022-08-03
Patent
Electronic Resource
Japanese
COLUMN-BEAM FRAME REPAIRING METHOD AND REPAIRED COLUMN-BEAM FRAME
European Patent Office | 2018
|