REMAINING NECESSARY AMOUNT CALCULATION METHOD OF FRESH CONCRETE, REMAINING NECESSARY AMOUNT CALCULATION SYSTEM OF FRESH CONCRETE, ORDERING SUPPORT SYSTEM OF FRESH CONCRETE
To provide a method for calculating a remaining amount of fresh concrete necessary for completing placement work, in the middle of the placement work.SOLUTION: This method includes: (a) a step of continuously or intermittently detecting remaining height corresponding to a distance related to the vertical direction from a crown position of a mold to a liquid level of fresh concrete, during placement work; (b) a step of calculating a reference area when a placement scheduled region is viewed from vertically above based on the position information of the mold, during the placement work or before starting the placement work; and (c) a step of continuously or intermittently calculating the remaining necessary amount of the fresh concrete by performing arithmetic processing based on the information of the remaining height and the information of the reference area.SELECTED DRAWING: Figure 1
【課題】打設作業の途中において、当該打設作業を完了させるのに必要なフレッシュコンクリートの残量を算出するための方法を提供する。【解決手段】この方法は、打設作業中に、型枠の天端の位置からフレッシュコンクリートの液面までの鉛直方向に係る距離に対応した残り高さを連続的又は断続的に検知する工程(a)と、打設作業中又は打設作業の開始前に、型枠の位置情報に基づいて打設予定領域を鉛直上方から見たときの基準面積を算出する工程(b)と、残り高さの情報と基準面積の情報とに基づいて演算処理を行ってフレッシュコンクリートの残必要量を連続的又は断続的に算出する工程(c)とを有する。【選択図】図1
REMAINING NECESSARY AMOUNT CALCULATION METHOD OF FRESH CONCRETE, REMAINING NECESSARY AMOUNT CALCULATION SYSTEM OF FRESH CONCRETE, ORDERING SUPPORT SYSTEM OF FRESH CONCRETE
To provide a method for calculating a remaining amount of fresh concrete necessary for completing placement work, in the middle of the placement work.SOLUTION: This method includes: (a) a step of continuously or intermittently detecting remaining height corresponding to a distance related to the vertical direction from a crown position of a mold to a liquid level of fresh concrete, during placement work; (b) a step of calculating a reference area when a placement scheduled region is viewed from vertically above based on the position information of the mold, during the placement work or before starting the placement work; and (c) a step of continuously or intermittently calculating the remaining necessary amount of the fresh concrete by performing arithmetic processing based on the information of the remaining height and the information of the reference area.SELECTED DRAWING: Figure 1
【課題】打設作業の途中において、当該打設作業を完了させるのに必要なフレッシュコンクリートの残量を算出するための方法を提供する。【解決手段】この方法は、打設作業中に、型枠の天端の位置からフレッシュコンクリートの液面までの鉛直方向に係る距離に対応した残り高さを連続的又は断続的に検知する工程(a)と、打設作業中又は打設作業の開始前に、型枠の位置情報に基づいて打設予定領域を鉛直上方から見たときの基準面積を算出する工程(b)と、残り高さの情報と基準面積の情報とに基づいて演算処理を行ってフレッシュコンクリートの残必要量を連続的又は断続的に算出する工程(c)とを有する。【選択図】図1
REMAINING NECESSARY AMOUNT CALCULATION METHOD OF FRESH CONCRETE, REMAINING NECESSARY AMOUNT CALCULATION SYSTEM OF FRESH CONCRETE, ORDERING SUPPORT SYSTEM OF FRESH CONCRETE
フレッシュコンクリートの残必要量算出方法、フレッシュコンクリートの残必要量算出システム、及びフレッシュコンクリートの発注支援システム
NAKAZAKI GOSHI (author) / ERIGUCHI REI (author) / KUDO MASATOMO (author)
2022-10-07
Patent
Electronic Resource
Japanese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
European Patent Office | 2022
|FRESH CONCRETE DETERMINATION METHOD AND FRESH CONCRETE DETERMINATION DEVICE
European Patent Office | 2021
|Wiley | 2011
|Wiley | 2022
|