CONSTRUCTION METHOD OF COLUMN JOINT PORTION
To provide a construction method of a column joint portion capable of disposing a second column at a proper position with respect to a first column when joining a lower first column with an upper second column.SOLUTION: A construction method of a column joint portion 1 includes: a step of preparing a plurality of temporary bolts 30, 40; a step of installing the plurality of temporary bolts in a plurality of screw holes 12 formed in a first end plate 11 at an upper end of a first steel column 10; a step of inserting the plurality of temporary bolts into a plurality of through holes 22 formed in a second end plate 21 of a second steel column 20; a step of bringing the second end plate into contact with the first end plate; a step of screwing a nut 50 to the plurality of temporary bolts to temporarily fix the second steel column; a step of performing distortion correction; a step of replacing the temporary bolt with a permanent bolt; and a step of finally fastening the permanent bolt. The temporary bolt includes: a first temporary bolt 30 with a first length L1; and a second temporary bolt 40 with a second length L2 that is shorter than the first length.SELECTED DRAWING: Figure 9
【課題】下方の第1柱と上方の第2柱を接合する際に、第1柱に対する第2柱の位置を適切に配置することが可能な柱継手部の施工方法を提供する。【解決手段】複数の仮ボルト30,40を用意する工程と、第1鉄骨柱10の上端部の第1エンドプレート11に形成された複数のネジ穴12に複数の仮ボルトを設置する工程と、第2鉄骨柱20の第2エンドプレート21に形成された複数の貫通孔22に複数の仮ボルトを挿通する工程と、第1エンドプレートに第2エンドプレートを当接させる工程と、複数の仮ボルトにナット50を螺合して第2鉄骨柱を仮固定する工程と、建て入れ直しを行う工程と、仮ボルトを本ボルトと入れ替える工程と、本ボルトを本締めする工程と、を行い、仮ボルトは、第1長さL1の第1仮ボルト30と、第1長さよりも短い第2長さL2の第2仮ボルト40と、を含む柱継手部1の施工方法。【選択図】図9
CONSTRUCTION METHOD OF COLUMN JOINT PORTION
To provide a construction method of a column joint portion capable of disposing a second column at a proper position with respect to a first column when joining a lower first column with an upper second column.SOLUTION: A construction method of a column joint portion 1 includes: a step of preparing a plurality of temporary bolts 30, 40; a step of installing the plurality of temporary bolts in a plurality of screw holes 12 formed in a first end plate 11 at an upper end of a first steel column 10; a step of inserting the plurality of temporary bolts into a plurality of through holes 22 formed in a second end plate 21 of a second steel column 20; a step of bringing the second end plate into contact with the first end plate; a step of screwing a nut 50 to the plurality of temporary bolts to temporarily fix the second steel column; a step of performing distortion correction; a step of replacing the temporary bolt with a permanent bolt; and a step of finally fastening the permanent bolt. The temporary bolt includes: a first temporary bolt 30 with a first length L1; and a second temporary bolt 40 with a second length L2 that is shorter than the first length.SELECTED DRAWING: Figure 9
【課題】下方の第1柱と上方の第2柱を接合する際に、第1柱に対する第2柱の位置を適切に配置することが可能な柱継手部の施工方法を提供する。【解決手段】複数の仮ボルト30,40を用意する工程と、第1鉄骨柱10の上端部の第1エンドプレート11に形成された複数のネジ穴12に複数の仮ボルトを設置する工程と、第2鉄骨柱20の第2エンドプレート21に形成された複数の貫通孔22に複数の仮ボルトを挿通する工程と、第1エンドプレートに第2エンドプレートを当接させる工程と、複数の仮ボルトにナット50を螺合して第2鉄骨柱を仮固定する工程と、建て入れ直しを行う工程と、仮ボルトを本ボルトと入れ替える工程と、本ボルトを本締めする工程と、を行い、仮ボルトは、第1長さL1の第1仮ボルト30と、第1長さよりも短い第2長さL2の第2仮ボルト40と、を含む柱継手部1の施工方法。【選択図】図9
CONSTRUCTION METHOD OF COLUMN JOINT PORTION
柱継手部の施工方法
HAYASHI TEPPEI (author)
2022-10-12
Patent
Electronic Resource
Japanese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
COLUMN BASE PORTION STRUCTURE IN STRUCTURE, AND COLUMN BASE PORTION FIXING METHOD
European Patent Office | 2021
|JOINT STRUCTURE AND CONSTRUCTION METHOD OF BEAM END JOINT PORTION
European Patent Office | 2024
|European Patent Office | 2024
|