A platform for research: civil engineering, architecture and urbanism
To provide a through hole arrangement material capable of being constructed without any problems even when a through hole and a long body are misaligned.SOLUTION: A through hole arrangement material 1 comprises: a locking part 2 that is used to fill a space of a portion through which a long body L penetrates in a through hole H formed in a partition body C in a structure, is located at an outer edge in a radial direction, and is locked to an outer surface surrounding the through hole H or an inner peripheral surface of the through hole H when arranged in the through hole H; a hole part 3 located inside in the radial direction, and through which the long body L passes; and a displacement absorption part 4 that is located between the locking part 2 and the hole part 3, can expand and contract in the radial direction, and can change the position of the hole part 3 in the radial direction along with the expansion and contraction.SELECTED DRAWING: Figure 1
【課題】貫通穴と長尺体とが芯ずれしていても、問題なく施工できる貫通穴配置材を提供することを課題とする。【解決手段】構造物における区画体Cに形成された貫通穴Hにおける長尺体Lが貫通する部分の空間を埋めるために用いられ、径方向の外縁に位置し、前記貫通穴Hへの配置時に前記貫通穴Hを囲む外面または前記貫通穴Hの内周面に対して係止される係止部2と、径方向の内部に位置し、前記長尺体Lが通るよう貫通した穴部3と、前記係止部2と前記穴部3との間に位置し、径方向に伸縮可能であって、当該伸縮に伴い前記穴部3の径方向の位置を変化させられる変位吸収部4と、を有する、貫通穴配置材1である。【選択図】図1
To provide a through hole arrangement material capable of being constructed without any problems even when a through hole and a long body are misaligned.SOLUTION: A through hole arrangement material 1 comprises: a locking part 2 that is used to fill a space of a portion through which a long body L penetrates in a through hole H formed in a partition body C in a structure, is located at an outer edge in a radial direction, and is locked to an outer surface surrounding the through hole H or an inner peripheral surface of the through hole H when arranged in the through hole H; a hole part 3 located inside in the radial direction, and through which the long body L passes; and a displacement absorption part 4 that is located between the locking part 2 and the hole part 3, can expand and contract in the radial direction, and can change the position of the hole part 3 in the radial direction along with the expansion and contraction.SELECTED DRAWING: Figure 1
【課題】貫通穴と長尺体とが芯ずれしていても、問題なく施工できる貫通穴配置材を提供することを課題とする。【解決手段】構造物における区画体Cに形成された貫通穴Hにおける長尺体Lが貫通する部分の空間を埋めるために用いられ、径方向の外縁に位置し、前記貫通穴Hへの配置時に前記貫通穴Hを囲む外面または前記貫通穴Hの内周面に対して係止される係止部2と、径方向の内部に位置し、前記長尺体Lが通るよう貫通した穴部3と、前記係止部2と前記穴部3との間に位置し、径方向に伸縮可能であって、当該伸縮に伴い前記穴部3の径方向の位置を変化させられる変位吸収部4と、を有する、貫通穴配置材1である。【選択図】図1
THROUGH HOLE ARRANGEMENT MATERIAL
貫通穴配置材
TATSUTA YOSHIAKI (author)
2022-10-18
Patent
Electronic Resource
Japanese
IPC:
F16L
PIPES
,
Rohre
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
BEAM THROUGH HOLE ARRANGEMENT DETERMINATION PROGRAM AND BEAM THROUGH HOLE ARRANGEMENT METHOD
European Patent Office | 2020
|Open-hole tension capacity of pultruded GFRP having staggered hole arrangement
Online Contents | 2015
|