A platform for research: civil engineering, architecture and urbanism
To solve the problems that conventional suspension mounts are heavy, it is necessary to prepare an expensive steel material in order to suspend a heavy air conditioner or the like, horizontal pulling and installation of a suspension hang for a heavy object are heavy and labor intensive, further there is a risk because such suspension mounts are mounted at a high place, and that weighting in a vertical direction, is always applied at a ceiling slab due to a heavy object.SOLUTION: A suspension mount 1 comprises a plurality of vertical column members 2 and a horizontal beam member set 4 composed of the plurality of horizontal beam members 3, where a plurality of horizontal beam member sets 4 is provided. The respective horizontal beam member set 4 are respectively attached to a plurality of predetermined height level mounting positions V, W, ... of the vertical column members 2. Regarding intervals a, b, c, ... between vertically adjacent mounting positions, for at least two predetermined intervals, the upper interval is smaller than the lower interval.SELECTED DRAWING: Figure 1
【課題】従来の吊下げ架台は重量が重く、重い空調機器などを吊り下げるには高価な鋼材を用意する必要があり、また、重量物の吊下げ架台を横引き・取付け作業は重たく人手がかかり、高所にて取付ける為、危険があった。尚、重量物により天井スラブに部は常に鉛直の方向に加重がかかっていた。【解決手段】複数本の縦柱部材2と、複数本の横梁部材3で構成される横梁部材セット4とを備える吊下げ架台1であって、横梁部材セット4は複数セット備えられ、各横梁部材セット4はそれぞれ、縦柱部材2の所定の複数の高さレベルの取付け位置V,W、。。。に取り付けられており、上下に隣接しあう取付け位置同士の間隔a,b,c,...について、少なくとも所定の二つの間隔に関しては、上方に位置する間隔の方がそれより下方に位置する間隔より小さい吊下げ架台。【選択図】 図1
To solve the problems that conventional suspension mounts are heavy, it is necessary to prepare an expensive steel material in order to suspend a heavy air conditioner or the like, horizontal pulling and installation of a suspension hang for a heavy object are heavy and labor intensive, further there is a risk because such suspension mounts are mounted at a high place, and that weighting in a vertical direction, is always applied at a ceiling slab due to a heavy object.SOLUTION: A suspension mount 1 comprises a plurality of vertical column members 2 and a horizontal beam member set 4 composed of the plurality of horizontal beam members 3, where a plurality of horizontal beam member sets 4 is provided. The respective horizontal beam member set 4 are respectively attached to a plurality of predetermined height level mounting positions V, W, ... of the vertical column members 2. Regarding intervals a, b, c, ... between vertically adjacent mounting positions, for at least two predetermined intervals, the upper interval is smaller than the lower interval.SELECTED DRAWING: Figure 1
【課題】従来の吊下げ架台は重量が重く、重い空調機器などを吊り下げるには高価な鋼材を用意する必要があり、また、重量物の吊下げ架台を横引き・取付け作業は重たく人手がかかり、高所にて取付ける為、危険があった。尚、重量物により天井スラブに部は常に鉛直の方向に加重がかかっていた。【解決手段】複数本の縦柱部材2と、複数本の横梁部材3で構成される横梁部材セット4とを備える吊下げ架台1であって、横梁部材セット4は複数セット備えられ、各横梁部材セット4はそれぞれ、縦柱部材2の所定の複数の高さレベルの取付け位置V,W、。。。に取り付けられており、上下に隣接しあう取付け位置同士の間隔a,b,c,...について、少なくとも所定の二つの間隔に関しては、上方に位置する間隔の方がそれより下方に位置する間隔より小さい吊下げ架台。【選択図】 図1
SUSPENSION MOUNT
吊下げ架台
NAKA SATOSHI (author)
2022-12-21
Patent
Electronic Resource
Japanese
IPC:
F24F
Klimatisierung
,
AIR-CONDITIONING
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
Truss suspension convenient to mount and demount for concrete beam construction
European Patent Office | 2020
|